Solar · United Kingdom
St Hughs Monastery, Henfield Road - Solar Array
Operator The Trustees Of St Hughs Charterhouse
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 11 October 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
St Hughs Monastery, Henfield Road - Solar Array is a 0.2 MW solar farm 7.4 km south-east of Southwater, West Sussex, United Kingdom. Its planning application (DC/22/1513) went to Horsham on 9 August 2022 and was granted on 4 October 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when St Hughs Monastery, Henfield Road - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for St Hughs Monastery, Henfield Road - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1522, Fire damages roof with one solar panel in The Charltons, 17 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1522 | 2026 | Fire damages roof with one solar panel in The Charltons | 17 km | Minor |
| EIR-1527 | 2023 | Fire affects solar panels on nursing home roof in Woodingdean | 21 km | Minor |
| EIR-1303 | 2017 | Solar panel inverter fault destroys two Lewes homes | 22 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- The Trustees Of St Hughs Charterhouse
- Location
- St Hughs Monastery Henfield Road Partridge Green, West Sussex, RH13 8EB, United Kingdom
- Planning authority
- Horsham
- Planning application
- DC/22/1513
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/22/1513, with what the planning evidence pack adds for this site.
Every application in Horsham · Alerts for applications and incidents near here
Timeline
- 9 August 2022 Planning application submitted
- 4 October 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names St Hughs Monastery, Henfield Road - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has St Hughs Monastery, Henfield Road - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names St Hughs Monastery, Henfield Road - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of St Hughs Monastery, Henfield Road - Solar Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 October 2022.
- Where is St Hughs Monastery, Henfield Road - Solar Array?
- 7.4 km south-east of Southwater, West Sussex, United Kingdom (postcode RH13 8EB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).