Battery storage · United Kingdom

Bolney - Battery Storage

Operator Elements Green · Owner Elements Green New Parent LTD

Awaiting Construction200 MWData checked 16 November 2026Source record dated 7 April 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bolney - Battery Storage is a 200 MW battery storage site 5.9 km north-west of Hurstpierpoint, West Sussex, United Kingdom. Its planning application (DM/21/2276) went to Horsham on 22 June 2021 and was granted on 5 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ELEMENTS GREEN LIMITED (13665201), active, since 2021. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bolney - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 73 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction73 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire144 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter228 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
200 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elements Green
Owner
Elements Green New Parent LTD
Location
Land east of Wineham Lane, Wineham, Henfield, West Sussex, BN5 9AY, United Kingdom
Planning authority
Horsham
Planning application
DM/21/2276

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/21/2276, with what the planning evidence pack adds for this site.

Every application in Horsham · Alerts for applications and incidents near here

  • 22 June 2021 Planning application submitted
  • 5 September 2024 Planning permission granted
  • 5 September 2027 Planning permission runs out

None found. The register holds no published incident that names Bolney - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Bolney - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bolney - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bolney - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 April 2026.
Where is Bolney - Battery Storage?
5.9 km north-west of Hurstpierpoint, West Sussex, United Kingdom (postcode BN5 9AY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).