← Back to West Sussex
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage

Operator Low Carbon UK Solar

Awaiting ConstructionData checked 16 November 2026Source record dated 16 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage is a battery storage site 5.4 km south-east of Southwater, West Sussex, United Kingdom. Its planning application (DC/23/2172) went to Horsham on 29 November 2023 and was granted on 24 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 73 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction73 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire139 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter225 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Low Carbon UK Solar
Location
Cobwood Solar Farm, Burnthouse Lane, Cowfold, Horsham, West Sussex, RH13 8DG, United Kingdom
Planning authority
Horsham
Planning application
DC/23/2172

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/23/2172, with what the planning evidence pack adds for this site.

Every application in Horsham · Alerts for applications and incidents near here

  • 29 November 2023 Planning application submitted
  • 24 May 2024 Planning permission granted
  • 24 May 2027 Planning permission runs out

None found. The register holds no published incident that names Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2026.
Where is Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage?
5.4 km south-east of Southwater, West Sussex, United Kingdom (postcode RH13 8DG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).