Solar · United Kingdom

Ford Farm (Ashurst)

Operator Conergy · Owner Kawa Solar Holdings LTD

Operational10 MWData checked 16 November 2026Source record dated 1 April 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ford Farm (Ashurst) is a 10 MW solar farm 6.2 km north of Steyning, West Sussex, United Kingdom. Its planning application (DC/13/2310) went to Horsham on 9 December 2013 and was granted on appeal on 9 September 2015. It has been operating since 29 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 8 other sites and 217 energy sites within 40 km for Ford Farm (Ashurst)

Members see the sites and incidents around this one, and every record behind them.

CONERGY UK LIMITED (07884713), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Conergy
Owner
Kawa Solar Holdings LTD
Location
Land North of Sopers Copse Honeybridge Lane Ashurst West Sussex, West Sussex, United Kingdom
Planning authority
Horsham
Planning application
DC/13/2310
Appeal reference
APP/Z3825/W/14/2222037
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/13/2310, with what the planning evidence pack adds for this site.

Every application in Horsham · Alerts for applications and incidents near here

  • 9 December 2013 Planning application submitted
  • 2 May 2014 Planning permission refused
  • 30 July 2014 Appeal lodged
  • 9 September 2015 Planning permission granted
  • 9 September 2015 Appeal granted
  • 15 November 2015 Construction started
  • 29 February 2016 Operational

None found. The register holds no published incident that names Ford Farm (Ashurst). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ford Farm (Ashurst) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ford Farm (Ashurst); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ford Farm (Ashurst)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2016.
Where is Ford Farm (Ashurst)?
6.2 km north of Steyning, West Sussex, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).