← Back to Derbyshire

Solar · United Kingdom

Arkwright Solar Farm

Operator Conergy · Owner Kawa Solar Holdings LTD

Operational8 MWData checked 16 November 2026Source record dated 15 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Arkwright Solar Farm is a 8 MW solar farm on the edge of Staveley, Derbyshire, United Kingdom. Its planning application (CHE/14/00644/FUL) went to Chesterfield on 15 September 2014 and was granted on 24 February 2015. It has been operating since 18 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, 37 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 8 other sites and 595 energy sites within 40 km for Arkwright Solar Farm

Members see the sites and incidents around this one, and every record behind them.

CONERGY UK LIMITED (07884713), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Conergy
Owner
Kawa Solar Holdings LTD
Location
Land To West Of Duckmanton and North Of Tom Lane Chesterfield Derbyshire, Derbyshire, United Kingdom
Planning authority
Chesterfield
Planning application
CHE/14/00644/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CHE/14/00644/FUL, with what the planning evidence pack adds for this site.

Every application in Chesterfield · Alerts for applications and incidents near here

  • 15 September 2014 Planning application submitted
  • 24 February 2015 Planning permission granted
  • 1 June 2015 Construction started
  • 18 December 2015 Operational

None found. The register holds no published incident that names Arkwright Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Arkwright Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arkwright Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Arkwright Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 December 2015.
Where is Arkwright Solar Farm?
On the edge of Staveley, Derbyshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).