← Back to Warwickshire

Solar · United Kingdom

Blackwell Grange Solar Farm

Operator Conergy · Owner Kawa Solar Holdings LTD

Operational5 MWData checked 16 November 2026Source record dated 26 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blackwell Grange Solar Farm is a 5 MW solar farm 4.1 km north-west of Shipston on Stour, Warwickshire, United Kingdom. Its planning application (14/01732/FUL) went to Stratford-on-Avon on 21 July 2014 and was granted on appeal on 1 March 2016. It has been operating since 15 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 8 other sites and 389 energy sites within 40 km for Blackwell Grange Solar Farm

Members see the sites and incidents around this one, and every record behind them.

CONERGY UK LIMITED (07884713), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Conergy
Owner
Kawa Solar Holdings LTD
Location
Land To North Of Ilmington Road Blackwell, Warwickshire, United Kingdom
Planning authority
Stratford-on-Avon
Planning application
14/01732/FUL
Appeal reference
APP/J3720/W/15/3132381
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01732/FUL, with what the planning evidence pack adds for this site.

Every application in Stratford-on-Avon · Alerts for applications and incidents near here

  • 21 July 2014 Planning application submitted
  • 23 March 2015 Planning permission refused
  • 1 September 2015 Appeal lodged
  • 1 March 2016 Planning permission granted
  • 1 March 2016 Appeal granted
  • 15 December 2016 Construction started
  • 15 March 2017 Operational

None found. The register holds no published incident that names Blackwell Grange Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Blackwell Grange Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blackwell Grange Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Blackwell Grange Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 April 2017.
Where is Blackwell Grange Solar Farm?
4.1 km north-west of Shipston on Stour, Warwickshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).