Battery storage · United Kingdom

Crimscote Solar Farm and Storage Project

Operator Regener8 SPV1 Limited

Under ConstructionData checked 16 November 2026Source record dated 6 August 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Crimscote Solar Farm and Storage Project is a battery storage site 7.7 km north-west of Shipston on Stour, Warwickshire, United Kingdom. Its planning application (21/02017/FUL) went to Stratford-on-Avon on 18 June 2021 and was granted on 29 November 2022. Construction started on 1 July 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 11 other energy sites within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crimscote Solar Farm and Storage Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 49 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire49 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells117 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction161 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Under Construction
Operator or applicant
Regener8 SPV1 Limited
Location
Crimscote WimpstoneView, Warwickshire, CV37 8UF, United Kingdom
Planning authority
Stratford-on-Avon
Planning application
21/02017/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/02017/FUL, with what the planning evidence pack adds for this site.

Every application in Stratford-on-Avon · Alerts for applications and incidents near here

  • 18 June 2021 Planning application submitted
  • 29 November 2022 Planning permission granted
  • 1 July 2024 Construction started

None found. The register holds no published incident that names Crimscote Solar Farm and Storage Project. If you know of one, report it (confidential reports are anonymised).

Has Crimscote Solar Farm and Storage Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crimscote Solar Farm and Storage Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Crimscote Solar Farm and Storage Project?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 August 2024.
Where is Crimscote Solar Farm and Storage Project?
7.7 km north-west of Shipston on Stour, Warwickshire, United Kingdom (postcode CV37 8UF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).