Priors Byne Farm

Operator Gamma Solar Limited

Operational7.6 MWData checked 16 November 2026Source record dated 23 January 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Priors Byne Farm is a 7.6 MW solar farm 6.6 km north of Steyning, West Sussex, United Kingdom. Its planning application (DC/13/2381) went to Horsham on 18 December 2013 and was granted on appeal on 15 April 2015. It has been operating since 20 January 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 214 energy sites within 40 km for Priors Byne Farm

Members see the sites and incidents around this one, and every record behind them.

GAMMA SOLAR LIMITED (08518972), dissolved, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
7.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Gamma Solar Limited
Location
Priors Byne Farm Bines Road Partridge Green Horsham West Sussex, West Sussex, RH13 8EQ, United Kingdom
Planning authority
Horsham
Planning application
DC/13/2381
Appeal reference
APP/Z3825/A/14/2219843
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/13/2381, with what the planning evidence pack adds for this site.

Every application in Horsham · Alerts for applications and incidents near here

  • 18 December 2013 Planning application submitted
  • 16 April 2014 Planning permission refused
  • 15 June 2014 Appeal lodged
  • 15 April 2015 Planning permission granted
  • 15 April 2015 Appeal granted
  • 1 August 2015 Construction started
  • 20 January 2016 Operational

None found. The register holds no published incident that names Priors Byne Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Priors Byne Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Priors Byne Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Priors Byne Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 January 2017.
Where is Priors Byne Farm?
6.6 km north of Steyning, West Sussex, United Kingdom (postcode RH13 8EQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).