Solar · United Kingdom
Ingham solar farm
Operator Gamma Solar Limited
Revised26 MWData checked 16 November 2026Source record dated 7 January 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Ingham solar farm is a 26 MW solar farm 7.2 km north of Bury St Edmunds, Suffolk, United Kingdom. Its planning application (SE/13/0905/FUL) went to West Suffolk on 24 July 2013 and was refused on appeal on 7 January 2015. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 16 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Ingham solar farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
GAMMA SOLAR LIMITED (08518972), dissolved, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ingham solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 41 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1262 | 2024 | Fire reported on solar-panel roof at Fitzwilliam College auditorium | 41 km | Minor |
| EIR-2815 | 2026 | Solar panel on school roof starts primary school fire in Ipswich | 41 km | Significant |
| EIR-2731 | 2021 | Electrical fault in solar panel control unit sparks loft fire in Ipswich | 41 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 26 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Gamma Solar Limited
- Location
- Land North West Of Ingham, Thetford Road, Ingham, Suffolk, United Kingdom
- Planning authority
- West Suffolk
- Planning application
- SE/13/0905/FUL
- Appeal reference
- APP/E3525/A/14/2218805
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for SE/13/0905/FUL, with what the planning evidence pack adds for this site.
Every application in West Suffolk · Alerts for applications and incidents near here
Timeline
- 24 July 2013 Planning application submitted
- 7 February 2014 Planning permission refused
- 2 June 2014 Appeal lodged
- 7 January 2015 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Ingham solar farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Ingham solar farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Ingham solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Ingham solar farm?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 7 January 2015.
- Where is Ingham solar farm?
- 7.2 km north of Bury St Edmunds, Suffolk, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).