Solar · United Kingdom

New Tyning Farm

Operator INRG Solar

Appeal Refused5.8 MWData checked 16 November 2026Source record dated 25 November 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

New Tyning Farm is a 5.8 MW solar farm on the edge of Radstock, Somerset, United Kingdom. Its planning application (2013/1356) went to Somerset on 29 June 2013 and was refused on appeal on 1 October 2014. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 29 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 17 other sites and 473 energy sites within 40 km for New Tyning Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
INRG Solar
Location
New Tyning Farm, Waterside Lane, Kilmersdon, Bath, Avon, Somerset, BA3 5TE, United Kingdom
Planning authority
Somerset
Planning application
2013/1356
Appeal reference
APP/Q3305/A/14/2214650

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2013/1356, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 29 June 2013 Planning application submitted
  • 16 January 2014 Planning permission refused
  • 17 March 2014 Appeal lodged
  • 1 October 2014 Appeal refused

None found. The register holds no published incident that names New Tyning Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has New Tyning Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New Tyning Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of New Tyning Farm?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 25 November 2014.
Where is New Tyning Farm?
On the edge of Radstock, Somerset, United Kingdom (postcode BA3 5TE).