Battery storage · United Kingdom

Little Crow Solar Park

Operator INRG Solar

Awaiting Construction90 MWData checked 16 November 2026Source record dated 8 April 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Little Crow Solar Park is a 90 MW battery storage site 4.4 km north-east of Scunthorpe, Lincolnshire, United Kingdom. Its planning application (EN010101) went to The Planning Inspectorate - National Infrastructure on 4 December 2020 and was granted on 5 April 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 46 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Little Crow Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 64 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells64 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool155 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire228 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
90 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
INRG Solar
Location
Land located 0.6km to the east of the British Steel site at Scunthorpe, Lincolnshire, DN16 1XP, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010101

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010101, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 4 December 2020 Planning application submitted
  • 5 April 2022 Planning permission granted
  • 5 April 2027 Planning permission runs out

None found. The register holds no published incident that names Little Crow Solar Park. If you know of one, report it (confidential reports are anonymised).

Has Little Crow Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Little Crow Solar Park; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Little Crow Solar Park?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2025.
Where is Little Crow Solar Park?
4.4 km north-east of Scunthorpe, Lincolnshire, United Kingdom (postcode DN16 1XP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).