Solar · United Kingdom
Little Crow Solar Park
Operator INRG Solar
Awaiting Construction150 MWData checked 16 November 2026Source record dated 7 April 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Little Crow Solar Park is a 150 MW solar farm on the edge of Scunthorpe, Lincolnshire, United Kingdom. Its planning application (EN010101) went to The Planning Inspectorate - National Infrastructure on 4 December 2020 and was granted on 5 April 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Little Crow Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Satellite heat detections at this site
2 heat detections within 1.5 km of this site on NASA's fire satellites, 13 Nov 2026 to 14 Nov 2026. A detection is a heat anomaly, not a confirmed fire: a flare, a controlled burn or a neighbouring field can set it off. Members see each detection and are told the day one is made at a site they watch.
Source: NASA FIRMS (LANCE), VIIRS. Read each morning.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Little Crow Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 27 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1552 | 2023 | Fire starts in solar panels on commercial roof in Doncaster | 27 km | Significant |
| EIR-1175 | 2026 | Rooftop solar panel fire guts NHS mental health ward in Malton | 64 km | Significant |
| EIR-0764 | 2024 | Transformer smoking at solar farm in Burton Pedwardine | 70 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 150 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- INRG Solar
- Location
- Land located 0.6km to the east of the British Steel site at Scunthorpe, Lincolnshire, DN16 1AX, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010101
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010101, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 4 December 2020 Planning application submitted
- 5 April 2022 Planning permission granted
- 5 April 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Little Crow Solar Park. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Little Crow Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Little Crow Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Little Crow Solar Park?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 April 2022.
- Where is Little Crow Solar Park?
- On the edge of Scunthorpe, Lincolnshire, United Kingdom (postcode DN16 1AX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).