Solar · United Kingdom
Hendre Fawr Farm
Operator INRG Solar
Operational11.6 MWData checked 16 November 2026Source record dated 19 August 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hendre Fawr Farm is a 11.6 MW solar farm on the edge of Glyn-neath, West Glamorgan, United Kingdom. Its planning application (P2013/0635) went to Neath Port Talbot on 18 September 2013 and was granted on 6 July 2014. It has been operating since 6 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hendre Fawr Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 11.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- INRG Solar
- Location
- Land at Hendrefawr Farm, Mount Road, Rhigos, Neath, West Glamorgan, West Glamorgan, CF44 9RJ, United Kingdom
- Planning authority
- Neath Port Talbot
- Planning application
- P2013/0635
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P2013/0635, with what the planning evidence pack adds for this site.
Every application in Neath Port Talbot · Alerts for applications and incidents near here
Timeline
- 18 September 2013 Planning application submitted
- 6 July 2014 Planning permission granted
- 15 November 2014 Construction started
- 6 March 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Hendre Fawr Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hendre Fawr Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hendre Fawr Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hendre Fawr Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 August 2015.
- Where is Hendre Fawr Farm?
- On the edge of Glyn-neath, West Glamorgan, United Kingdom (postcode CF44 9RJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).