Onshore wind · United Kingdom

Maesgwyn Wind Farm - extension

Operator Pennant Walters (MAESX) Limited

Operational2.5 MWData checked 16 November 2026Source record dated 21 June 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Maesgwyn Wind Farm - extension is a 2.5 MW wind farm on the edge of Glyn-neath, West Glamorgan, United Kingdom. Its planning application (P2014/0733) went to Neath Port Talbot on 15 August 2014 and was granted on 17 December 2015. It has been operating since 29 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

314 energy sites within 40 km for Maesgwyn Wind Farm - extension

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.5 MW (this record)
All phases
28.5 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Pennant Walters (MAESX) Limited
Location
Maesgwyn Wind Farm Between Onllwyn & Glynneath, West Glamorgan, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2014/0733
First operating
2016
Turbines
1

This record is 2.5 MW, one part of a site built in phases. With Maesgwyn (26 MW) the phases on the register add up to 28.5 MW. Maesgwyn

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2014/0733, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 15 August 2014 Planning application submitted
  • 17 December 2015 Planning permission granted
  • 21 January 2016 Construction started
  • 29 March 2016 Operational

None found. The register holds no published incident that names Maesgwyn Wind Farm - extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Maesgwyn Wind Farm - extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maesgwyn Wind Farm - extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Maesgwyn Wind Farm - extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 21 June 2017.
Where is Maesgwyn Wind Farm - extension?
On the edge of Glyn-neath, West Glamorgan, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).