Onshore wind · United Kingdom
Maesgwyn
Operator Pennant Wind Energy Ventures
Operational26 MWData checked 16 November 2026Source record dated 25 October 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Maesgwyn is a 26 MW wind farm 3.1 km south-west of Glyn-neath, West Glamorgan, United Kingdom. Its planning application (P/2006/1261) went to Neath Port Talbot on 1 October 2006 and was granted on 5 May 2009. It has been operating since 14 April 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Maesgwyn changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 26 MW (this record)
- All phases
- 28.5 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Pennant Wind Energy Ventures
- Location
- Maesgwyn, Glynneath, Neath, West Glamorgan. SA11, West Glamorgan, United Kingdom
- Planning authority
- Neath Port Talbot
- Planning application
- P/2006/1261
- First operating
- 2011
- Turbines
- 13
This record is 26 MW, one part of a site built in phases. With Maesgwyn Wind Farm - extension (2.5 MW) the phases on the register add up to 28.5 MW. Maesgwyn Wind Farm - extension
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2006/1261, with what the planning evidence pack adds for this site.
Every application in Neath Port Talbot · Alerts for applications and incidents near here
Timeline
- 1 October 2006 Planning application submitted
- 5 May 2009 Planning permission granted
- 1 July 2010 Construction started
- 14 April 2011 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Maesgwyn. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Maesgwyn had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Maesgwyn; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Maesgwyn?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 October 2011.
- Where is Maesgwyn?
- 3.1 km south-west of Glyn-neath, West Glamorgan, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).