Onshore wind · United Kingdom

Maesgwyn Wind Farm - extension (Phase 2)

Operator Pennant Walters (MAESX)

Planning Permission Expired7 MWData checked 16 November 2026Source record dated 27 January 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Maesgwyn Wind Farm - extension (Phase 2) is a 7 MW wind farm on the edge of Glyn-neath, Neath Port Talbot, United Kingdom. Its planning application (P2014/0733) went to Neath Port Talbot on 15 August 2014 and was granted on 17 December 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 23 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

314 energy sites within 40 km for Maesgwyn Wind Farm - extension (Phase 2)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Pennant Walters (MAESX)
Location
Maesgwyn Wind Farm Between Onllwyn & Glynneath, Neath Port Talbot, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2014/0733
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2014/0733, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 15 August 2014 Planning application submitted
  • 17 December 2015 Planning permission granted
  • 17 December 2020 Planning permission expired

None found. The register holds no published incident that names Maesgwyn Wind Farm - extension (Phase 2). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Maesgwyn Wind Farm - extension (Phase 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Maesgwyn Wind Farm - extension (Phase 2); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Maesgwyn Wind Farm - extension (Phase 2)?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 January 2020.
Where is Maesgwyn Wind Farm - extension (Phase 2)?
On the edge of Glyn-neath, Neath Port Talbot, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).