Onshore wind · United Kingdom
Maesgwyn Wind Farm - extension (Phase 2)
Operator Pennant Walters (MAESX)
Planning Permission Expired7 MWData checked 16 November 2026Source record dated 27 January 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Maesgwyn Wind Farm - extension (Phase 2) is a 7 MW wind farm on the edge of Glyn-neath, Neath Port Talbot, United Kingdom. Its planning application (P2014/0733) went to Neath Port Talbot on 15 August 2014 and was granted on 17 December 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 23 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Maesgwyn Wind Farm - extension (Phase 2) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Pennant Walters (MAESX)
- Location
- Maesgwyn Wind Farm Between Onllwyn & Glynneath, Neath Port Talbot, United Kingdom
- Planning authority
- Neath Port Talbot
- Planning application
- P2014/0733
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P2014/0733, with what the planning evidence pack adds for this site.
Every application in Neath Port Talbot · Alerts for applications and incidents near here
Timeline
- 15 August 2014 Planning application submitted
- 17 December 2015 Planning permission granted
- 17 December 2020 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Maesgwyn Wind Farm - extension (Phase 2). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Maesgwyn Wind Farm - extension (Phase 2) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Maesgwyn Wind Farm - extension (Phase 2); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Maesgwyn Wind Farm - extension (Phase 2)?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 January 2020.
- Where is Maesgwyn Wind Farm - extension (Phase 2)?
- On the edge of Glyn-neath, Neath Port Talbot, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).