← Back to Somerset

Battery storage · United Kingdom

Midsomer Norton - Battery Energy Storage System

Operator Conrad Energy (Developments) II Limited · Owner Conrad Energy (Developments) Limited

Operational6 MWData checked 16 November 2026Source record dated 11 August 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Midsomer Norton - Battery Energy Storage System is a 6 MW battery storage site in Midsomer Norton, Somerset, United Kingdom. Its planning application (21/03281/FUL) went to Bath and North East Somerset on 9 July 2021 and was granted on 21 December 2022. Construction started on 1 August 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 27 other sites and 490 energy sites within 40 km for Midsomer Norton - Battery Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED (12886485), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational (Under Construction)
Operator or applicant
Conrad Energy (Developments) II Limited
Owner
Conrad Energy (Developments) Limited
Location
S/O Unit 18, Midsomer Enterprise Park, Midsomer Norton, Radstock, Somerset, BA3 2BB, United Kingdom
Planning authority
Bath and North East Somerset
Planning application
21/03281/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/03281/FUL, with what the planning evidence pack adds for this site.

Every application in Bath and North East Somerset · Alerts for applications and incidents near here

  • 9 July 2021 Planning application submitted
  • 1 August 2022 Construction started
  • 21 December 2022 Planning permission granted

None found. The register holds no published incident that names Midsomer Norton - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Midsomer Norton - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Midsomer Norton - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Midsomer Norton - Battery Energy Storage System?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 August 2022.
Where is Midsomer Norton - Battery Energy Storage System?
In Midsomer Norton, Somerset, United Kingdom (postcode BA3 2BB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).