Bridges Electrical Engineers, Second Avenue - Solar Panels

Operator Bridges Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 14 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bridges Electrical Engineers, Second Avenue - Solar Panels is a 0.3 MW solar farm on the edge of Midsomer Norton, Somerset, United Kingdom. Its planning application (24/00157/SOLPA) went to Bath and North East Somerset on 15 January 2024 and was granted on 26 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bridges Electrical Engineers, Second Avenue - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton14 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol19 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels20 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Bridges Limited
Location
Bridges Electrical Engineers Limited, Unit 8, Second Avenue, Westfield, Radstock, Somerset, BA3 4BH, United Kingdom
Planning authority
Bath and North East Somerset
Planning application
24/00157/SOLPA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00157/SOLPA, with what the planning evidence pack adds for this site.

Every application in Bath and North East Somerset · Alerts for applications and incidents near here

  • 26 February 2015 Planning permission expired
  • 15 January 2024 Planning application submitted
  • 26 February 2024 Planning permission granted

None found. The register holds no published incident that names Bridges Electrical Engineers, Second Avenue - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Bridges Electrical Engineers, Second Avenue - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bridges Electrical Engineers, Second Avenue - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bridges Electrical Engineers, Second Avenue - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 March 2024.
Where is Bridges Electrical Engineers, Second Avenue - Solar Panels?
On the edge of Midsomer Norton, Somerset, United Kingdom (postcode BA3 4BH).