Solar · United Kingdom

Manor Farm (Dorset)

Operator INRG Solar

Operational5 MWData checked 16 November 2026Source record dated 23 July 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Manor Farm (Dorset) is a 5 MW solar farm 3.4 km north-west of Gillingham, Dorset, United Kingdom. Its planning application (2/2013/0791/PLNG) went to Dorset on 5 August 2013 and was granted on 8 November 2013. It has been operating since 9 June 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 17 other sites and 304 energy sites within 40 km for Manor Farm (Dorset)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
INRG Solar
Location
Land At Manor Farm E377815 N128359, Gillingham, Dorset, Dorset, United Kingdom
Planning authority
Dorset
Planning application
2/2013/0791/PLNG
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/2013/0791/PLNG, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 5 August 2013 Planning application submitted
  • 8 November 2013 Planning permission granted
  • 30 November 2013 Construction started
  • 9 June 2014 Operational

None found. The register holds no published incident that names Manor Farm (Dorset). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Manor Farm (Dorset) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Manor Farm (Dorset); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Manor Farm (Dorset)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 July 2014.
Where is Manor Farm (Dorset)?
3.4 km north-west of Gillingham, Dorset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).