← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Dorset

Manor Farm (Dorset)

Operational5 MWApplication 2/2013/0791/PLNGSubmitted 5 August 2013Granted 8 November 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2/2013/0791/PLNG
Planning authority
Dorset
Nation
England
Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
INRG Solar
Location
Land At Manor Farm E377815 N128359, Gillingham, Dorset
First operating
2014
  • 5 August 2013 Planning application submitted
  • 8 November 2013 Planning permission granted
  • 30 November 2013 Construction started
  • 9 June 2014 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton16 kmSignificant
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton36 kmMinor
EIR-19642022Fire damages solar panels at Verwood farm during heatwave37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Manor Farm (Dorset) is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Dorset.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.