Dorset: energy planning applications
145 battery, solar and wind applications in the government planning database for Dorset, 1.9 GW in all. 14 still in planning.
14In planning
60Granted or being built
44Operating
27Refused, withdrawn or closed
Battery storage 16 · Solar 118 · Onshore wind 11 · Battery storage across the UK · Solar across the UK · Wind across the UK
Alerts for applications near you
An email when an application near your postcode in Dorset or beyond is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Every application in Dorset, newest first
- Lytchett Minster School, Post Green Road - Solar PanelsSolar · 0.3 MW · Application Withdrawn · submitted 2 April 2026 · P/PASO/2026/01896
- Waterside Holiday Park, Bowleaze Coveway - Solar ArraysSolar · Application Submitted · submitted 16 September 2025 · P/FUL/2025/04477
- Caswell Farm, Common Lane - Battery Energy StorageBattery storage · 20 MW · Application Submitted · submitted 19 August 2025 · P/FUL/2025/03066
- Caswell Farm, Common Lane - Solar FarmSolar · 40 MW · Application Submitted · submitted 19 August 2025 · P/FUL/2025/03066
- Motcombe Road, Motcombe - Solar Pv ArraysSolar · 12 MW · Application Submitted · submitted 29 July 2025 · P/FUL/2025/03674
- Dorset Innovation Park, Newburgh - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 25 July 2025 · P/PASO/2025/04392
- Cruxton Farm - Solar FarmSolar · 12 MW · Application Refused · submitted 11 April 2025 · P/FUL/2025/00485
- Thomas Hardye School - Solar PanelsSolar · 0.6 MW · Awaiting Construction · submitted 25 March 2025 · P/PASO/2025/01614
- Rogers Hill Farm -Wind Turbine RepoweringOnshore wind · 2 MW · Application Submitted · submitted 20 March 2025 · P/FUL/2025/01365
- Damers First School - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 17 March 2025 · P/PASO/2025/01529
- The Purbeck School, Worgret Road - Solar Photovoltaic PanelsSolar · 0.1 MW · Awaiting Construction · submitted 12 March 2025 · P/PASO/2025/01391
- Merck, The Old Brickyard - Solar Photo-Voltaic ModulesSolar · 0.7 MW · Awaiting Construction · submitted 7 March 2025 · P/PASO/2025/01369
- Tecan Way, Granby Industrial Estate - Ground Mounted Solar PanelsSolar · Awaiting Construction · submitted 24 February 2025 · P/FUL/2025/00525
- Sainsburys Supermarket, Ringwood Road - Solar PanelsSolar · 0.4 MW · Awaiting Construction · submitted 3 February 2025 · P/PASO/2025/00593
- Eweleaze Spinney - Battery Energy Storage FacilityBattery storage · 49.9 MW · Awaiting Construction · submitted 4 September 2024 · P/FUL/2024/04447
- Buckland Battery StorageBattery storage · 150 MW · Application Refused · submitted 2 September 2024 · P/FUL/2024/04993
- Dextra Group, Brickfields Business Park - Solar PV SystemsSolar · 0.2 MW · Awaiting Construction · submitted 1 March 2024 · P/PASO/2024/01181
- St Giles House, Creech Hill - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 4 December 2023 · P/FUL/2023/05478
- Holt Road - Battery Energy StorageBattery storage · 47.5 MW · Awaiting Construction · submitted 10 November 2023 · P/FUL/2023/06578
- Lower Silton, Fantley Lane - Solar PanelsSolar · 0.2 MW · Application Withdrawn · submitted 25 August 2023 · P/FUL/2023/04798
- East Chickerell Court Farm - Battery Energy Storage SystemBattery storage · 400 MW · Awaiting Construction · submitted 14 August 2023 · P/FUL/2023/04657
- Copse Barn, Wytherston Farm - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 29 June 2023 · P/PASO/2023/03071
- Bridec Melamine Boards, West Bay Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 16 June 2023 · P/FUL/2023/03426
- Woodlands Manor Farm, Horton - Solar FarmSolar · 30 MW · Awaiting Construction · submitted 15 June 2023 · P/FUL/2023/03415
- North Farm, Horton - Solar FarmSolar · 19 MW · Awaiting Construction · submitted 16 May 2023 · P/FUL/2023/02829
- Post Farm, Lytchett Minster - Battery Energy StorageBattery storage · 32 MW · Awaiting Construction · submitted 16 May 2023 · P/FUL/2023/02819
- Prince Of Wales Road - Solar Photovoltaic EquipmentSolar · 0.2 MW · Awaiting Construction · submitted 4 May 2023 · P/PASO/2023/02406
- Riversmeet, Hardings Lane - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 4 May 2023 · P/PASO/2023/02617
- Tecan Way, Granby Industrial Estate - Solar Photo Voltaic PanelsSolar · 1 MW · Awaiting Construction · submitted 28 April 2023 · P/PASO/2023/02526
- Coldharbour, Chickerell - Battery Storage FacilityBattery storage · 60 MW · Application Refused · submitted 25 April 2023 · P/FUL/2023/02446
- Bridec Melamine Boards, West Bay Road - Solar PanelsSolar · 0.2 MW · Revised · submitted 28 March 2023 · P/PASO/2023/01399
- Tecan Way, Granby Industrial Estate - Solar PanelsSolar · 0.2 MW · Revised · submitted 1 March 2023 · P/PASO/2023/01265
- Wraxall Road, Higher Wraxall - Solar FarmSolar · 13.5 MW · Application Withdrawn · submitted 16 February 2023 · P/FUL/2023/00953
- Highlands End Holiday Park, Highlands End -Solar PV PanelsSolar · 0.2 MW · Awaiting Construction · submitted 10 February 2023 · P/FUL/2023/00384
- Birchwood Tourist Park, Bere Road - Solar PV PanelsSolar · 0.2 MW · Awaiting Construction · submitted 26 January 2023 · P/FUL/2023/00475
- Littlesea Holiday Park, Lynch Lane - Solar photovoltaicsSolar · 0.3 MW · Awaiting Construction · submitted 13 December 2022 · P/PASO/2022/07800
- Seaview Holiday Park,Preston Road- Solar Photovoltaics PanelsSolar · 0.2 MW · Awaiting Construction · submitted 13 December 2022 · P/PASO/2022/07810
- Hospital Metalcraft, Blandford Heights Industrial Estate - Solar PanelsSolar · Awaiting Construction · submitted 30 November 2022 · P/PASO/2022/07365
- Wessex Water Palmersford Sewage Treatment, Humber Road - Solar PanelsSolar · Application Withdrawn · submitted 21 November 2022 · P/CLP/2022/07327
- Golden Cap Holiday Park, Seatown - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 18 November 2022 · P/FUL/2022/07144
- Morrisons Supermarket, Dorchester Road - Solar PanelsSolar · 0.4 MW · Awaiting Construction · submitted 27 October 2022 · P/PASO/2022/06703
- Shaftesbury Energy Park - Battery Storage SystemBattery storage · 100 MW · Awaiting Construction · submitted 12 October 2022 · P/FUL/2022/06179
- Brickfields Business Park, Unit 17 - Solar panelsSolar · 0.6 MW · Under Construction · submitted 11 October 2022 · P/PASO/2022/06287
- Brickfields Business Park, Unit 16 - Solar PanelsSolar · 0.2 MW · Under Construction · submitted 10 October 2022 · P/PASO/2022/06222
- Brickfields Business Park, Unit 24 - Solar panelsSolar · 0.2 MW · Under Construction · submitted 10 October 2022 · P/PASO/2022/06286
- Cumberland Drive, Granby Industrial Estate - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 7 October 2022 · P/PASO/2022/06191
- Brickfields Business Park, Unit 35 - Solar PanelsSolar · 0.3 MW · Under Construction · submitted 6 October 2022 · P/PASO/2022/06178
- Whittle Boxland, Whittle Road - Energy Storage FacilityBattery storage · 0.2 MW · Awaiting Construction · submitted 27 September 2022 · P/FUL/2022/05957
- Sandford Holiday Park, Organford Road - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 23 September 2022 · P/PASO/2022/05898
- Warmwell Leisure Resort, Warmwell Road - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 23 September 2022 · P/PASO/2022/05857
- Atrim Road, Dottery - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 15 September 2022 · P/FUL/2022/05708
- High East - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 28 June 2022 · P/FUL/2022/03964
- Chickerell - Solar Photovoltaics PanelSolar · 0.3 MW · Awaiting Construction · submitted 27 May 2022 · P/PASO/2022/03357
- Wyld Meadow Farm - Battery energy storageBattery storage · Awaiting Construction · submitted 17 May 2022 · P/FUL/2022/02658
- Galton Manor Farm - Solar FarmSolar · 30 MW · Awaiting Construction · submitted 13 April 2022 · P/FUL/2022/02429
- Dorchesters Corn Exchange - Solar Panels & Biomass BoilerSolar · Under Construction · submitted 22 December 2021 · P/FUL/2021/05705
- Cherry Grove - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 30 November 2021 · P/PASO/2021/05169
- Chickerell Road, Chickerell - Solar Photovoltaics (PV) EquipmentSolar · Operational · submitted 30 November 2021 · P/PASO/2021/05147
- Ferndown Upper School - Solar ArraySolar · 0.3 MW · Awaiting Construction · submitted 30 November 2021 · P/PASO/2021/05165
- Jubilee Close - Solar photovoltaicsSolar · 0.2 MW · Awaiting Construction · submitted 30 November 2021 · P/PASO/2021/05136
- Sandford Road, Sandford - Solar Photovoltaics PV EquipmentSolar · 0.2 MW · Awaiting Construction · submitted 30 November 2021 · P/PASO/2021/05168
- Shrubbery Lane - Solar Photovoltaic PanelsSolar · 0.2 MW · Awaiting Construction · submitted 30 November 2021 · P/PASO/2021/05151
- The Purbeck School - Solar panelsSolar · 0.3 MW · Awaiting Construction · submitted 23 September 2021 · P/PASO/2021/03636
- Conifers Primary School - Solar PhotovoltaicsSolar · Awaiting Construction · submitted 20 September 2021 · P/PASO/2021/03531
- County Hall - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 20 September 2021 · P/PASO/2021/03546
- Highlands End, Eype - Solar Panel Photovoltaic Solar ArraysSolar · 0.2 MW · Revised · submitted 7 September 2021 · P/FUL/2021/03350
- Blandford Hill - EV Charging Station & Solar FarmSolar · 15 MW · Awaiting Construction · submitted 27 July 2021 · P/FUL/2021/02622
- Blandford Hill - EV Charging Station & Solar FarmBattery storage · 3 MW · Awaiting Construction · submitted 27 July 2021 · P/FUL/2021/02622
- Fernbrook - Solar farm & Battery storageSolar · 49.9 MW · Awaiting Construction · submitted 2 July 2021 · P/FUL/2021/02046
- Fernbrook - Solar farm & Battery storageBattery storage · Awaiting Construction · submitted 2 July 2021 · P/FUL/2021/02046
- Cruxton Farm - Solar FarmSolar · 11.8 MW · Revised · submitted 1 June 2021 · P/FUL/2021/01920
- North Dairy Farm Solar FarmSolar · 30 MW · Awaiting Construction · submitted 15 April 2021 · P/FUL/2021/01018
- Weymouth College Solar PanelsSolar · 0.5 MW · Awaiting Construction · submitted 5 February 2021 · WP/21/00123/SOL
- Mannington Battery Energy Storage SystemBattery storage · 49.9 MW · Under Construction · submitted 22 January 2021 · 3/21/0137/FUL
- North Fossil Farm - Solar PanelsSolar · 40 MW · Awaiting Construction · submitted 21 January 2021 · 6/2020/0595
- Burton Bradstock Solar PanelsSolar · Under Construction · submitted 21 October 2020 · WD/D/20/002595
- Clifton FarmSolar · 35 MW · Operational · submitted 5 May 2020 · WD/D/20/001057
- Stokeford FarmSolar · 12 MW · Revised · submitted 1 May 2020 · 6/2020/0158
- Higher Stockbridge FarmSolar · 35 MW · Awaiting Construction · submitted 23 December 2019 · WD/D/19/003181
- South Farm Solar ParkSolar · 40 MW · Operational · submitted 21 June 2019 · 2/2019/0850/PAEIA
- South Farm Solar ParkBattery storage · 10 MW · Operational · submitted 21 June 2019 · 2/2019/0850/PAEIA
- Higher FarmSolar · 11 MW · Appeal Refused · submitted 1 April 2019 · 2/2019/0470/FUL
- Hawkers Hill Energy ParkBattery storage · 20 MW · Operational · submitted 28 July 2017 · 2/2017/1066/FUL
- Gashay LaneSolar · 5 MW · Application Refused · submitted 15 October 2015 · WD/D/15/001863
- Warren Park Solar FarmSolar · 5 MW · Planning Permission Expired · submitted 21 September 2015 · 3/15/1020/FUL
- The Down HouseSolar · 5 MW · Abandoned · submitted 16 September 2015 · 2/2015/1129/PAEIA
- Southern Counties Shooting Ground Phase 2Solar · 5 MW · Operational · submitted 8 September 2015 · WD/D/15/001862
- Alton Mead LaneSolar · 5 MW · Planning Permission Expired · submitted 5 September 2015 · WD/D/15/001841
- Stokeford FarmSolar · 28.5 MW · Operational · submitted 19 August 2015 · 6/2015/0516
- Holly Farm Solar ParkSolar · 5 MW · Operational · submitted 29 July 2015 · WD/D/15/001856
- Land at East FarmSolar · 5 MW · Operational · submitted 29 July 2015 · WD/D/15/001858
- Galton Manor Solar ParkSolar · 5 MW · Operational · submitted 14 July 2015 · WD/D/15/001708
- Land at Stalbridge ParkSolar · 5 MW · Operational · submitted 3 July 2015 · 2/2015/0898/FUL
- Independent QuarriesSolar · 3 MW · Abandoned · submitted 16 February 2015 · WP/15/00039/FUL
- Southern Counties Shooting Ground Phase 1Solar · 9 MW · Operational · submitted 24 December 2014 · WD/D/14/003367
- Rampisham NorthSolar · 5 MW · Operational · submitted 19 November 2014 · WD/D/14/002974
- Slyer's LaneOnshore wind · 18 MW · Application Refused · submitted 18 November 2014 · WD/D/14/002611
- Woodtown FarmSolar · 3.8 MW · Operational · submitted 24 October 2014 · 3/14/0956/FUL
- Land at Newlands FarmSolar · 5 MW · Operational · submitted 13 October 2014 · WD/D/14/002675
- LittletonSolar · 12.1 MW · Operational · submitted 23 September 2014 · 2/2014/1066/FUL
- Cross Roads PlantationSolar · 5 MW · Operational · submitted 19 August 2014 · 3/14/0774/FUL
- Bedborough FarmSolar · 7 MW · Operational · submitted 14 August 2014 · 3/14/0790/FUL
- North Farm (Spetisbury)Solar · 11.6 MW · Operational · submitted 13 August 2014 · 2/2014/0825/FUL
- Oaklands PlantationSolar · 5 MW · Operational · submitted 30 June 2014 · 6/2014/0338
- Blandford Hill Wind FarmOnshore wind · 12 MW · Application Refused · submitted 27 June 2014 · 2/2014/0768/PAEIA
- Yellowham solar parkSolar · 20 MW · Appeal Refused · submitted 12 June 2014 · WD/D/14/001496
- West Dorset Wind FarmOnshore wind · 12.5 MW · Application Withdrawn · submitted 27 May 2014 · WD/D/14/000885
- Southern Counties Shooting GroundSolar · 8.8 MW · Revised · submitted 21 May 2014 · WD/D/14/001307
- Verwood Solar FarmSolar · 20.4 MW · Operational · submitted 15 April 2014 · 3/14/0457/FUL
- Henbury QuarrySolar · 3.9 MW · Operational · submitted 20 September 2013 · 3/13/0948/FUL
- Bourne Park (Solar)Solar · 5 MW · Operational · submitted 9 August 2013 · 1/D/13/001116
- Manor Farm (Dorset)Solar · 5 MW · Operational · submitted 5 August 2013 · 2/2013/0791/PLNG
- Woolbridge Solar ParkSolar · 5 MW · Operational · submitted 5 August 2013 · 6/2013/0446
- Bottom PlainSolar · 10 MW · Operational · submitted 2 August 2013 · 6/2013/0443
- Bourne FarmSolar · 2.4 MW · Operational · submitted 1 August 2013 · 1/D/13/001044
- Mapperton FarmSolar · 24 MW · Application Withdrawn · submitted 25 July 2013 · 3/13/0681/FUL
- Wedgehill FarmSolar · 13 MW · Operational · submitted 22 July 2013 · 3/13/0669/FUL
- Canada FarmSolar · 8.3 MW · Operational · submitted 8 July 2013 · 2/2013/0770/PLNG
- Corton FarmSolar · 10 MW · Application Refused · submitted 4 June 2013 · 1/D/13/000772
- Homeland Solar FarmSolar · 13.2 MW · Operational · submitted 28 May 2013 · 3/13/0470/FUL
- The FernsSolar · 1.5 MW · Abandoned · submitted 14 May 2013 · 2/2013/0442/PLNG
- Caswell Farm Solar ParkSolar · 6.7 MW · Operational · submitted 8 March 2013 · 1/D/13/000242
- North of Newton FarmSolar · 3 MW · Operational · submitted 6 March 2013 · 6/2013/0133
- Race farmSolar · 6.1 MW · Operational · submitted 6 March 2013 · 6/2013/0132
- South Newton FarmSolar · 11.3 MW · Operational · submitted 6 March 2013 · 6/2013/0134
- West Dorset Wind FarmOnshore wind · 12.5 MW · Revised · submitted 6 February 2013 · 1/D/13/000183
- Rampisham Down Transmitting StationSolar · 24 MW · Application Withdrawn · submitted 3 December 2012 · 1/D/12/001664
- Slaughtergate FarmSolar · 1.8 MW · Operational · submitted 31 August 2012 · 2/2012/1042/PLNG
- Trigon Solar FarmSolar · 7 MW · Operational · submitted 5 July 2012 · 6/2012/0415
- NOTTINGTON LANE SOLAR FARMSolar · 5 MW · Operational · submitted 31 May 2012 · 1/D/12/000858
- Solar FarmSolar · 1.5 MW · Abandoned · submitted 18 April 2012 · 1/D/12/000430
- Dolmans Hill (Redbridge Farm) Solar ArraysSolar · 5 MW · Operational · submitted 2 April 2012 · 6/2012/0228
- OKEFORD FITZPAINE - SOLAR FARMSolar · 1.5 MW · Application Withdrawn · submitted 20 March 2012 · 2/2012/0254/PLNG
- Rudge Hill FarmSolar · 1.5 MW · Operational · submitted 20 March 2012 · 2/2012/0253/PLNG
- Slepe FarmBattery storage · 0.3 MW · Operational · submitted 21 June 2011
- Stour Row Solar FarmSolar · 12 MW · Planning Permission Expired · submitted 7 June 2011 · 2/2011/0713/PLNG
- Wyld Meadow Solar FarmSolar · 4.8 MW · Operational · submitted 13 April 2011 · 1/D/11/000453
- Park FarmSolar · 4 MW · Operational · submitted 22 March 2011 · 2/2011/0304/PLNG
- Crossways Pit Solar FarmSolar · 5 MW · Operational · submitted 24 February 2011 · 1/D/11/000168
- Silton Wind FarmOnshore wind · 10 MW · Appeal Refused · submitted 4 August 2010 · 2/2010/0731/PLNG
- Alaska Wind FarmOnshore wind · 9.2 MW · Operational · submitted 20 November 2009 · 6/2010/0082
- Silton Wind ParkOnshore wind · 8 MW · Revised · submitted 26 June 2008 · 2/2008/0661
- Alaska Wind FarmOnshore wind · 13.8 MW · Revised · submitted 20 March 2008 · 6/2008/0234
- Part Bushes FarmOnshore wind · 24.8 MW · Application Refused · submitted 1 August 2003 · 2-2003-0765
- Brackenbury Infant SchoolOnshore wind · 2.5 MW · Application Withdrawn · submitted 19 October 2001
Refused, withdrawn or taken to appeal
Incidents on the register near Dorset's applications
20 incidents within 50 km of an application here, nearest first. Counts of incidents in published reporting, not rates.
For a planning case
The planning evidence pack sets out, for one application in Dorset, every comparable incident nearest first with its sources, the schemes refused, withdrawn or taken to appeal nearby, and the fire service guidance each incident bears on. Launch price: £145 until 31 October (normally £295). Download a sample pack (PDF).
Neighbouring planning authorities
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.