Wiltshire: energy planning applications
173 battery, solar and wind applications in the government planning database for Wiltshire, 2.8 GW in all. 26 still in planning.
26In planning
77Granted or being built
50Operating
20Refused, withdrawn or closed
Battery storage 43 · Solar 129 · Onshore wind 1 · Battery storage across the UK · Solar across the UK · Wind across the UK
Alerts for applications near you
An email when an application near your postcode in Wiltshire or beyond is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Every application in Wiltshire, newest first
- Stourhead, Near Mere - Solar ArraySolar · 0.4 MW · Application Submitted · submitted 10 June 2026 · PL/2026/03394
- Whitewalls, Easton Grey - Solar PV PanelsSolar · 0.2 MW · Application Submitted · submitted 4 June 2026 · PL/2026/03530
- Sainsburys Superstore, Bath Road - Solar PV PanelsSolar · 0.2 MW · Application Submitted · submitted 3 June 2026 · PL/2026/03504
- Ministry Of Defence, Westwells Road - Solar PanelsSolar · 0.2 MW · Application Submitted · submitted 29 April 2026 · PL/2026/02760
- Studley Grange Farm, Studley - Solar FarmSolar · 2.2 MW · Application Submitted · submitted 20 April 2026 · PL/2026/02160
- Knorr Bremse Rail Systems Uk, Westinghouse Way - Solar PanelsSolar · 0.4 MW · Awaiting Construction · submitted 16 April 2026 · PL/2026/02481
- Hangar 45, Yatesbury - Extensions & Solar PanelsSolar · 0.4 MW · Application Submitted · submitted 16 February 2026 · PL/2026/00418
- Chicklade EV Service Station - Solar FarmSolar · 3 MW · Application Submitted · submitted 12 February 2026 · PL/2026/00795
- Tesco, County Way - Solar Photovoltaic PanelsSolar · 0.2 MW · Awaiting Construction · submitted 30 January 2026 · PL/2026/00636
- The Salisbury Hospice, Salisbury District Hospital - Solar PV PanelsSolar · 0.2 MW · Awaiting Construction · submitted 29 January 2026 · PL/2026/00613
- Chemring Countermeasures Limited, Netton - Solar PanelsSolar · 0.3 MW · Application Refused · submitted 24 December 2025 · PL/2025/09805
- Salisbury District Hospital, Odstock Road - Solar PVSolar · 0.3 MW · Awaiting Construction · submitted 22 September 2025 · PL/2025/07284
- Mod Lyneham, Calne Road - Solar Array ( Project Cubit)Solar · Application Submitted · submitted 29 July 2025 · PL/2025/06157
- Brockleaze, Neston Park Estate - Battery Energy StorageBattery storage · 450 MW · Application Submitted · submitted 9 July 2025 · PL/2025/05552
- Grain Dryer, Manor Farm, - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 22 May 2025 · PL/2025/04062
- Hoopers Pool, Southwick - Solar PanelsSolar · 30 MW · Application Submitted · submitted 9 May 2025 · PL/2025/04328
- Blackthorn Solar FarmSolar · 40 MW · Application Submitted · submitted 2 May 2025 · PL/2025/03889
- Blackthorn Solar FarmBattery storage · Application Submitted · submitted 2 May 2025 · PL/2025/03889
- North Park, Savernake - Solar ArraySolar · 0.7 MW · Awaiting Construction · submitted 23 April 2025 · PL/2025/03471
- Salisbury District Hospital, Odstock Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 13 March 2025 · PL/2025/02615
- St Laurence School, Ashley Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 20 February 2025 · PL/2025/01249
- Lambdown Terrace, Swinton Barracks - Solar PanelsSolar · 0.8 MW · Awaiting Construction · submitted 3 February 2025 · PL/2025/01089
- Byde Mill Solar Farm, Poulshot - Solar FarmSolar · 13.5 MW · Awaiting Construction · submitted 27 January 2025 · PL/2024/11631
- North Allington Solar Farm - Solar FarmSolar · 10 MW · Awaiting Construction · submitted 29 October 2024 · PL/2024/09410
- Bentham House Farm, Mopes Lane - Solar FarmSolar · 12 MW · Awaiting Construction · submitted 24 September 2024 · PL/2024/08441
- Washington Road, West Wilts Trading Estate - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 6 August 2024 · PL/2024/07226
- Sloperton Farm, Westbrook - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 31 July 2024 · PL/2024/06048
- Apetito, Canal Road - Solar PanelsSolar · 1.3 MW · Awaiting Construction · submitted 25 July 2024 · PL/2024/06620
- Apetito, Canal Road - Solar PanelsSolar · 0.7 MW · Awaiting Construction · submitted 4 July 2024 · PL/2024/03852
- Blounts Court Farm, Potterne - Solar PanelsSolar · 15 MW · Application Refused · submitted 11 June 2024 · PL/2024/04926
- Whitefields Farm, Ogbourne St George - Solar PV PanelsSolar · 0.2 MW · Awaiting Construction · submitted 11 June 2024 · PL/2024/04870
- Interface Business Park, Bincknoll Lane - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 10 June 2024 · PL/2024/04933
- Chelworth Park, Chelworth Road - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 17 April 2024 · PL/2024/03653
- St Marys School, Curzon Street - Solar panelsSolar · 0.2 MW · Awaiting Construction · submitted 10 April 2024 · PL/2024/02237
- Springfield Community Campus, Beechfield Road - Solar Photovoltaic ArraysSolar · 0.2 MW · Awaiting Construction · submitted 12 March 2024 · PL/2024/02711
- Sands Farm Quarry, Low Lane - Battery StorageBattery storage · 4 MW · Application Submitted · submitted 28 February 2024 · PL/2024/01599
- Sands Farm Quarry, Low Lane - Solar PanelsSolar · 6 MW · Application Submitted · submitted 28 February 2024 · PL/2024/01599
- Morrisons, West Cepen Way - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 26 January 2024 · PL/2024/00519
- Salisbury District Hospital, Odstock Road - Solar PanelsSolar · 0.8 MW · Awaiting Construction · submitted 11 January 2024 · PL/2023/10887
- Potterne Park Farm, Potterne - Solar FarmSolar · 49.9 MW · Awaiting Construction · submitted 20 December 2023 · PL/2023/10332
- Swallett Energy ParkSolar · 23 MW · Awaiting Construction · submitted 5 December 2023 · PL/2023/10077
- Beech Tree Solar FarmSolar · 30 MW · Awaiting Construction · submitted 29 November 2023 · PL/2023/10394
- Mill Farm, Teffont - Battery Energy StorageBattery storage · 8.5 MW · Awaiting Construction · submitted 27 October 2023 · PL/2023/08472
- Red Barn - Solar Farm & Battery StorageSolar · 40 MW · Awaiting Construction · submitted 11 October 2023 · PL/2023/08481
- Red Barn - Solar Farm & Battery StorageBattery storage · 40 MW · Awaiting Construction · submitted 11 October 2023 · PL/2023/08481
- Ashley Garage - Solar PV ArraySolar · 1.1 MW · Application Withdrawn · submitted 11 September 2023 · PL/2023/07741
- Ashley Garage - Solar PV ArrayBattery storage · 0.5 MW · Application Withdrawn · submitted 11 September 2023 · PL/2023/07741
- Codford Biogas - Battery Energy Storage SystemBattery storage · Awaiting Construction · submitted 30 August 2023 · PL/2023/07227
- Sewage Works, Southampton Road - Solar FarmSolar · 2 MW · Application Withdrawn · submitted 23 August 2023 · PL/2023/06905
- Chemring Countermeasures Limited, High Post Road- Solar ArraySolar · Awaiting Construction · submitted 16 June 2023 · PL/2023/04203
- Codford Solar Farm Phase 4Solar · 18 MW · Awaiting Construction · submitted 19 May 2023 · PL/2023/03024
- Codford Solar Farm Phase 4Battery storage · Awaiting Construction · submitted 19 May 2023 · PL/2023/03025
- Moonraker Farm, Gastard - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 14 April 2023 · PL/2023/03023
- Stowford Manor Farm, Farleigh Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 12 April 2023 · PL/2023/02500
- Larkhill Garrison Glover Road - Solar Photovoltaic ArraySolar · Awaiting Construction · submitted 24 March 2023 · PL/2023/01992
- Whistle Mead Solar Farm, Little Chalfield - Solar FarmSolar · Application Submitted · submitted 6 March 2023 · PL/2023/01914
- Herman Miller, Portal Road - Solar PanelsSolar · 0.6 MW · Awaiting Construction · submitted 23 February 2023 · PL/2023/01314
- Wiltshire College, Lackham - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 20 January 2023 · PL/2022/09178
- Moonraker Farm, Gastard - Solar PanelsSolar · 0.3 MW · Revised · submitted 14 December 2022 · PL/2022/09590
- Cooles Farm, Minety - Solar Park/Battery StorageSolar · 8 MW · Application Submitted · submitted 7 November 2022 · PL/2022/08634
- Cooles Farm, Minety - Solar Park/Battery StorageBattery storage · Application Submitted · submitted 7 November 2022 · PL/2022/08634
- Wiltshire college, College Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 28 October 2022 · PL/2022/08335
- Morrisons, Weymouth Street - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 27 October 2022 · PL/2022/08326
- St Modwen Park, Motorway - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 23 September 2022 · PL/2022/06856
- Studley Grange Landfill Site, Garden Centre Road - Battery StorageBattery storage · 1 MW · Awaiting Construction · submitted 13 September 2022 · PL/2022/06399
- Ratfyn Water Recycling Centre, Amesbury - Solar PanelsSolar · 0.3 MW · Awaiting Construction · submitted 23 August 2022 · PL/2022/06564
- Westbury Sewage Treatment Works, Slag Lane - Solar PanelsSolar · Awaiting Construction · submitted 23 August 2022 · PL/2022/06569
- Parsonage Way - Solar PanelsSolar · 1.6 MW · Awaiting Construction · submitted 28 July 2022 · PL/2022/05444
- Edinburgh Way - Solar Photovolatic PanelSolar · 0.7 MW · Awaiting Construction · submitted 25 July 2022 · PL/2022/05332
- Stonehill Energy StorageBattery storage · 50 MW · Awaiting Construction · submitted 20 July 2022 · PL/2022/05504
- Fairholme, Minety - Battery StorageBattery storage · 50 MW · Awaiting Construction · submitted 14 July 2022 · PL/2022/05412
- Batten Road, Downton - Solar Photovoltaic PanelsSolar · 0.5 MW · Awaiting Construction · submitted 30 June 2022 · PL/2022/05023
- Norrington Gate Farm, Broughton Gifford - Battery Energy Storage FacilityBattery storage · 150 MW · Awaiting Construction · submitted 13 June 2022 · PL/2022/03914
- Ravensroost Farm, Minety - Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction · submitted 13 June 2022 · PL/2022/04524
- Somerford Farm, Brinkworth - Battery StorageBattery storage · 6.6 MW · Awaiting Construction · submitted 6 April 2022 · PL/2022/02824
- Southfield Farm - Battery Storage FacilityBattery storage · Application Withdrawn · submitted 23 March 2022 · PL/2022/02178
- Hulse Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction · submitted 26 January 2022 · PL/2022/00733
- Hulse Road - Solar PanelsSolar · 0.4 MW · Awaiting Construction · submitted 26 January 2022 · PL/2022/02373
- Pond Lane, Minety - Battery Storage FacilityBattery storage · Awaiting Construction · submitted 26 January 2022 · PL/2022/00664
- Dog Trap Lane, Minety - Battery Energy Storage SystemsBattery storage · 47.5 MW · Revised · submitted 17 January 2022 · PL/2022/00404
- Salisbury City Hall - Solar PV PanelsSolar · 0.2 MW · Awaiting Construction · submitted 20 December 2021 · PL/2021/11096
- Storridge Road - Battery StorageBattery storage · Awaiting Construction · submitted 29 November 2021 · PL/2021/10592
- Storridge Road - Solar FarmSolar · 31 MW · Awaiting Construction · submitted 29 November 2021 · PL/2021/10592
- Mopes Lane, Purton - Solar FarmSolar · 20 MW · Awaiting Construction · submitted 3 November 2021 · PL/2021/10405
- Studley Farm - Solar Farm & Battery StorageSolar · 49.9 MW · Awaiting Construction · submitted 30 September 2021 · PL/2021/08690
- Studley Farm - Solar Farm & Battery StorageBattery storage · Awaiting Construction · submitted 30 September 2021 · PL/2021/08690
- Malmesbury Road Solar FarmSolar · 13 MW · Awaiting Construction · submitted 23 September 2021 · PL/2021/09153
- Tiddlywink Barn Battery Storage Power PlantBattery storage · 20 MW · Abandoned · submitted 24 August 2021 · PL/2021/07610
- Leigh Delamere - Solar farm & Battery storageSolar · 49.9 MW · Under Construction · submitted 14 June 2021 · PL/2021/06100
- Leigh Delamere - Solar farm & Battery storageBattery storage · 40 MW · Under Construction · submitted 14 June 2021 · PL/2021/06100
- Forest Gate - Solar Farm & Battery StorageSolar · 49.9 MW · Awaiting Construction · submitted 11 June 2021 · PL/2021/06112
- Forest Gate - Solar Farm & Battery StorageBattery storage · 40 MW · Awaiting Construction · submitted 11 June 2021 · PL/2021/06112
- Whaddon Lane, HilpertonSolar · 25 MW · Awaiting Construction · submitted 10 May 2021 · PL/2021/03061
- Whaddon Lane, HilpertonBattery storage · 18 MW · Awaiting Construction · submitted 10 May 2021 · PL/2021/03061
- Crudwell Road Solar Farm & Battery StorageSolar · 49.9 MW · Awaiting Construction · submitted 25 March 2021 · 20/08618/FUL
- Crudwell Road Solar Farm & Battery StorageBattery storage · Awaiting Construction · submitted 25 March 2021 · 20/08618/FUL
- Minety South 2 - Battery Storage FacilityBattery storage · 50 MW · Operational · submitted 22 March 2021 · PL/2021/04151
- Bourne Hill Council OfficeSolar · Awaiting Construction · submitted 11 January 2021 · 21/00168/DP3
- HM Erlestoke Solar ArraySolar · 0.2 MW · Application Submitted · submitted 24 December 2020 · 20/11600/FUL
- National Grid Minety SubstationBattery storage · 49.9 MW · Awaiting Construction · submitted 28 August 2020 · 20/07390/FUL
- Wick Farm Melksham SubstationSolar · 49.9 MW · Under Construction · submitted 19 August 2020 · 20/06840/FUL
- Wick Farm, Melksham SubstationBattery storage · Under Construction · submitted 19 August 2020 · 20/06840/FUL
- Minety SubstationSolar · 40 MW · Awaiting Construction · submitted 27 April 2020 · 20/03528/FUL
- Minety SubstationBattery storage · 10 MW · Awaiting Construction · submitted 27 April 2020 · 20/03528/FUL
- Stonehill Energy Storage / Lower MinetyBattery storage · 50 MW · Operational · submitted 29 November 2019 · 19/11460/FUL
- Down Barn FarmSolar · 49.9 MW · Awaiting Construction · submitted 13 November 2019 · 19/10890/FUL
- Salisbury SubstationBattery storage · 49.5 MW · Operational · submitted 5 August 2019 · 19/05443/FUL
- Tiddlywink BarnBattery storage · 10 MW · Revised · submitted 15 July 2019 · 19/06775/FUL
- East Codford Solar Farm Extension Phase 3Solar · 18 MW · Operational · submitted 8 April 2019 · 19/03576/FUL
- Snarlton FarmBattery storage · 49.9 MW · Abandoned · submitted 22 March 2019 · 19/02437/FUL
- Leechpool Farm, Norrington Battery StorageBattery storage · 13 MW · Planning Permission Expired · submitted 10 May 2018 · 18/04039/FUL
- East Farm (Clay Pit Hill) - Extension IISolar · 6 MW · Application Withdrawn · submitted 24 April 2018 · 18/03167/FUL
- Park FarmBattery storage · 10 MW · Planning Permission Expired · submitted 9 March 2018 · 18/00952/FUL
- Land at Court FarmBattery storage · Appeal Refused · submitted 17 January 2018 · 18/00457/FUL
- Tiddlywink BarnBattery storage · 5 MW · Revised · submitted 9 November 2017 · 17/10611/FUL
- Stonehill Energy Storage / Upper MinetyBattery storage · 50 MW · Operational · submitted 29 June 2017 · 17/05526/FUL
- Melksham Substation East StorageBattery storage · 50 MW · Operational · submitted 10 May 2017 · 17/04110/FUL
- Minety NorthBattery storage · 50 MW · Abandoned · submitted 9 May 2017 · 17/03936/FUL
- Minety South - Battery StorageBattery storage · 50 MW · Operational · submitted 5 May 2017 · 17/03941/FUL
- Land At Moor Lane FarmSolar · 4.5 MW · Application Refused · submitted 25 August 2015 · 15/07244/FUL
- Park Grounds FarmSolar · 5 MW · Abandoned · submitted 11 August 2015 · 15/07373/FUL
- Land north of Ashton RoadSolar · 4 MW · Operational · submitted 22 July 2015 · 15/07413/FUL
- Brook Hall FarmSolar · 4.7 MW · Operational · submitted 12 June 2015 · 15/05656/FUL
- Land at Poles Hole FarmSolar · 6.8 MW · Operational · submitted 20 May 2015 · 15/04583/FUL
- Land West Side of Axe and Cleaver LaneSolar · 5 MW · Operational · submitted 14 May 2015 · 15/04570/FUL
- Brook Hall FarmSolar · 10 MW · Revised · submitted 9 February 2015 · 15/01199/FUL
- Trowle CommonSolar · 5 MW · Operational · submitted 6 January 2015 · 14/11649/FUL
- Bake Farm Solar FarmSolar · 5 MW · Operational · submitted 14 November 2014 · 14/10548/FUL
- Bradenstoke solar parkSolar · 69.8 MW · Operational · submitted 23 July 2014 · 14/06989/FUL
- Castle Combe CircuitSolar · 12 MW · Operational · submitted 16 July 2014 · 14/06821/FUL
- Bake FarmSolar · 14.3 MW · Revised · submitted 11 July 2014 · 14/06864/FUL
- Land east of Littledown Business ParkSolar · 6.2 MW · Operational · submitted 1 July 2014 · 14/06350/FUL
- Boscombe AirfieldSolar · 12.3 MW · Operational · submitted 12 June 2014 · 14/05740/FUL
- Cockhill Solar FarmSolar · 20 MW · Operational · submitted 10 June 2014 · 14/05596/FUL
- Little Chalfield Solar FarmSolar · 12 MW · Appeal Refused · submitted 29 May 2014 · 14/05253/FUL
- Water Eaton Farm / Port FarmSolar · 34.8 MW · Operational · submitted 25 April 2014 · 14/04326/FUL
- Bollands HillSolar · 4 MW · Appeal Refused · submitted 4 April 2014 · 14/03736/FUL
- Manor Farm (Wiltshire)Solar · 6.3 MW · Operational · submitted 17 March 2014 · 14/03084/FUL
- Lower End FarmSolar · 4.9 MW · Operational · submitted 12 March 2014 · 14/02273/FUL
- Wickfield FarmSolar · 5 MW · Operational · submitted 6 March 2014 · 14/02508/FUL
- Marsh Farm HilpertonSolar · 9.1 MW · Operational · submitted 29 January 2014 · 14/00592/FUL
- Roundponds Farm Solar ParkSolar · 13.5 MW · Operational · submitted 9 January 2014 · 13/06707/FUL
- Rock Farm / Goldborough Farm (Rookwood)Solar · 5 MW · Operational · submitted 20 December 2013 · 13/07071/FUL
- Bake FarmSolar · 16.1 MW · Application Withdrawn · submitted 5 December 2013 · 13/06336/FUL
- Snarlton Farm (Melksham solar farm)Solar · 49.6 MW · Operational · submitted 19 November 2013 · 13/06140/FUL
- Lodge Farm (Poulshot)Solar · 14.5 MW · Operational · submitted 23 October 2013 · 13/05244/FUL
- Land at East Farm - extensionSolar · 6 MW · Operational · submitted 9 October 2013 · 13/05001/FUL
- Bentham FarmSolar · 8 MW · Operational · submitted 8 October 2013 · 13/04872/FUL
- Manor Farm (Wiltshire)Solar · 9.6 MW · Revised · submitted 20 September 2013 · 13/04055/FUL
- Stokes Marsh FarmSolar · 16.6 MW · Operational · submitted 1 August 2013 · 13/02309/FUL
- Westbury (Closed) Landfill SiteSolar · 3.5 MW · Operational · submitted 17 July 2013 · 13/01962/WCM
- Spittleborough FarmSolar · 12 MW · Operational · submitted 15 July 2013 · 13/02191/FUL
- Hopton Road Industrial EstateSolar · 1.3 MW · Operational · submitted 3 July 2013 · 13/00984/FUL
- Braydon Manor FarmSolar · 8.7 MW · Operational · submitted 12 June 2013 · 13/01723/FUL
- NEWNTON DAIRY FARMSolar · 7.2 MW · Operational · submitted 12 June 2013 · 13/01561/FUL
- Deptford Farm solar parkSolar · 7.8 MW · Application Refused · submitted 24 May 2013 · 13/00699/FUL
- Hullavington Solar ParkSolar · 7 MW · Operational · submitted 22 May 2013 · 13/01495/FUL
- Battens Farm Solar ParkSolar · 11 MW · Operational · submitted 10 May 2013 · 13/01311/FUL
- High Penn Solar ParkSolar · 9.6 MW · Operational · submitted 25 February 2013 · 12/04169/FUL
- Land at East FarmSolar · 6.8 MW · Operational · submitted 3 January 2013 · W/12/02216/FUL
- Chelworth Industrial Estate Solar ParkSolar · 1 MW · Operational · submitted 5 December 2012 · 12/03968/FUL
- Blenches MillSolar · 6.1 MW · Operational · submitted 22 November 2012 · W/12/02081/FUL
- Norrington Common Solar FarmSolar · 10 MW · Operational · submitted 22 November 2012 · W/12/02072/FUL
- Marsh FarmSolar · 14 MW · Operational · submitted 27 July 2012 · 12/02104/FUL
- RUDGE FARM SOLAR FARMSolar · 7 MW · Operational · submitted 26 July 2012 · E/2012/0946/FUL
- Rodbourne Rail Farm - Solar ParkSolar · 7.6 MW · Operational · submitted 25 May 2012 · 12/01122/FUL
- CRAYSMARSH SOLAR FARMSolar · 1.8 MW · Operational · submitted 20 March 2012 · W/12/00467/FUL
- Kingston FarmSolar · 5 MW · Operational · submitted 31 March 2011 · W/11/01064/FUL
- Malmesbury SolarSolar · 5 MW · Operational · submitted 25 March 2011 · 11/01081/FUL
- Lake FarmSolar · 5 MW · Operational · submitted 14 January 2011 · 11/00003/FUL
- Summerslade Down Wind ClusterOnshore wind · 2.2 MW · Application Refused · submitted 14 October 1998
- Mod Lyneham, Calne Road - Solar Array ( Project Cubit)Battery storage · No Application Required
- Stonehill Energy Storage / Upper MinetyBattery storage · 50 MW · Operational · 18/04718/FUL
Refused, withdrawn or taken to appeal
Incidents on the register near Wiltshire's applications
23 incidents within 50 km of an application here, nearest first. Counts of incidents in published reporting, not rates.
For a planning case
The planning evidence pack sets out, for one application in Wiltshire, every comparable incident nearest first with its sources, the schemes refused, withdrawn or taken to appeal nearby, and the fire service guidance each incident bears on. Launch price: £145 until 31 October (normally £295). Download a sample pack (PDF).
Neighbouring planning authorities
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Every planning authority.