← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Dorset

Galton Manor Farm - Solar Farm

Awaiting Construction30 MWApplication P/FUL/2022/02429Submitted 13 April 2022Granted 30 March 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P/FUL/2022/02429
Planning authority
Dorset
Nation
England
Technology
Solar
Capacity
30 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Spring Dev 05 Limited
Location
Galton Manor Farm, DT2 8BZ
  • 13 April 2022 Planning application submitted
  • 30 March 2023 Planning permission granted
  • 28 April 2026 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1396, Solar panel fire leads to Travelodge evacuation in Poole, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole27 kmMinor
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown34 kmSignificant
EIR-15162025Solar panels suspected in house roof fire in Ferndown34 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DT2 8BZ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Dorset.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.