Solar · United Kingdom
Galton Manor Farm - Solar Farm
Operator Spring Dev 05 Limited
Awaiting Construction30 MWData checked 16 November 2026Source record dated 10 May 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Galton Manor Farm - Solar Farm is a 30 MW solar farm 10 km south-east of Dorchester, Dorset, United Kingdom. Its planning application (P/FUL/2022/02429) went to Dorset on 13 April 2022 and was granted on 30 March 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Galton Manor Farm - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Galton Manor Farm - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1396, Solar panel fire leads to Travelodge evacuation in Poole, 27 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1396 | 2024 | Solar panel fire leads to Travelodge evacuation in Poole | 27 km | Minor |
| EIR-1532 | 2023 | Roof-space fire involving a solar inverter at a house in Ferndown | 34 km | Significant |
| EIR-1516 | 2025 | Solar panels suspected in house roof fire in Ferndown | 34 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Spring Dev 05 Limited
- Location
- Galton Manor Farm, Dorset, DT2 8BZ, United Kingdom
- Planning authority
- Dorset
- Planning application
- P/FUL/2022/02429
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/FUL/2022/02429, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Timeline
- 13 April 2022 Planning application submitted
- 30 March 2023 Planning permission granted
- 28 April 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Galton Manor Farm - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Galton Manor Farm - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Galton Manor Farm - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Galton Manor Farm - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 May 2022.
- Where is Galton Manor Farm - Solar Farm?
- 10 km south-east of Dorchester, Dorset, United Kingdom (postcode DT2 8BZ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).