Merck, The Old Brickyard - Solar Photo-Voltaic Modules

Operator Ineco Energy Limited · Owner Ineco Group Limited

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Merck, The Old Brickyard - Solar Photo-Voltaic Modules is a 0.7 MW solar farm in Gillingham, Dorset, United Kingdom. Its planning application (P/PASO/2025/01369) went to Dorset on 7 March 2025 and was granted on 22 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INECO ENERGY LIMITED (10477244), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Merck, The Old Brickyard - Solar Photo-Voltaic Modules sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton20 kmSignificant
EIR-19642022Fire damages solar panels at Verwood farm during heatwave33 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning permission Granted)
Operator or applicant
Ineco Energy Limited
Owner
Ineco Group Limited
Location
Merck, The Old Brickyard, New Road, Sigma Aldrich Company Limited, Brickfields Industrial Estate, Gillingham, Dorset, SP8 4XT, United Kingdom
Planning authority
Dorset
Planning application
P/PASO/2025/01369

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/PASO/2025/01369, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 7 March 2025 Planning application submitted
  • 22 April 2025 Planning permission granted

None found. The register holds no published incident that names Merck, The Old Brickyard - Solar Photo-Voltaic Modules. If you know of one, report it (confidential reports are anonymised).

Has Merck, The Old Brickyard - Solar Photo-Voltaic Modules had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Merck, The Old Brickyard - Solar Photo-Voltaic Modules; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Merck, The Old Brickyard - Solar Photo-Voltaic Modules?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Merck, The Old Brickyard - Solar Photo-Voltaic Modules?
In Gillingham, Dorset, United Kingdom (postcode SP8 4XT).