Solar · United Kingdom

Brickfields Business Park, Unit 24 - Solar panels

Operator Dextra Lighting Systems Plc

Under Construction0.2 MWData checked 16 November 2026Source record dated 17 January 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brickfields Business Park, Unit 24 - Solar panels is a 0.2 MW solar farm in Gillingham, Dorset, United Kingdom. Its planning application (P/PASO/2022/06286) went to Dorset on 10 October 2022 and was granted on 12 May 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 26 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brickfields Business Park, Unit 24 - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton20 kmSignificant
EIR-19642022Fire damages solar panels at Verwood farm during heatwave33 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Dextra Lighting Systems Plc
Location
Units 1-4 And 12-20 And 24 Brickfields Business Park, Gillingham, Dorset, SP8 4PX, United Kingdom
Planning authority
Dorset
Planning application
P/PASO/2022/06286

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/PASO/2022/06286, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 10 October 2022 Planning application submitted
  • 30 November 2022 Planning permission refused
  • 30 January 2023 Planning permission expired
  • 12 May 2023 Planning permission granted

None found. The register holds no published incident that names Brickfields Business Park, Unit 24 - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Brickfields Business Park, Unit 24 - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brickfields Business Park, Unit 24 - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Brickfields Business Park, Unit 24 - Solar panels?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 January 2023.
Where is Brickfields Business Park, Unit 24 - Solar panels?
In Gillingham, Dorset, United Kingdom (postcode SP8 4PX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).