← Back to Dorset
Planning pack for this site, £295Other options

Solar · United Kingdom

Dextra Group, Brickfields Business Park - Solar PV Systems

Operator Dextra Group

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 15 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dextra Group, Brickfields Business Park - Solar PV Systems is a 0.2 MW solar farm in Gillingham, Dorset, United Kingdom. Its planning application (P/PASO/2024/01181) went to Dorset on 1 March 2024 and was granted on 8 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dextra Group, Brickfields Business Park - Solar PV Systems sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton20 kmSignificant
EIR-19642022Fire damages solar panels at Verwood farm during heatwave33 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Dextra Group
Location
Units 1-4 & 12-20 & 24, Brickfields Business Park, Gillingham, Dorset, SP8 4PX, United Kingdom
Planning authority
Dorset
Planning application
P/PASO/2024/01181

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/PASO/2024/01181, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 8 April 2011 Planning permission expired
  • 1 March 2024 Planning application submitted
  • 8 April 2024 Planning permission granted

None found. The register holds no published incident that names Dextra Group, Brickfields Business Park - Solar PV Systems. If you know of one, report it (confidential reports are anonymised).

Has Dextra Group, Brickfields Business Park - Solar PV Systems had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dextra Group, Brickfields Business Park - Solar PV Systems; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dextra Group, Brickfields Business Park - Solar PV Systems?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 April 2024.
Where is Dextra Group, Brickfields Business Park - Solar PV Systems?
In Gillingham, Dorset, United Kingdom (postcode SP8 4PX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).