← Back to Shropshire

Solar · United Kingdom

Land at High Point Farm

Operator TGC Renewables

Operational4.5 MWData checked 16 November 2026Source record dated 20 April 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at High Point Farm is a 4.5 MW solar farm 12 km south-east of Loughton, Shropshire, United Kingdom. Its planning application (14/04463/FUL) went to Shropshire on 22 October 2014 and was granted on appeal on 16 March 2016. It has been operating since 31 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 6 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 29 other sites and 321 energy sites within 40 km for Land at High Point Farm

Members see the sites and incidents around this one, and every record behind them.

TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
TGC Renewables
Location
High Point Farm, Neen Sollars, Shropshire, DY14 9AD, United Kingdom
Planning authority
Shropshire
Planning application
14/04463/FUL
Appeal reference
APP/L3245/W/15/3019429
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/04463/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 22 October 2014 Planning application submitted
  • 16 March 2015 Planning permission refused
  • 6 July 2015 Appeal lodged
  • 16 March 2016 Planning permission granted
  • 16 March 2016 Appeal granted
  • 12 December 2016 Construction started
  • 31 March 2017 Operational

None found. The register holds no published incident that names Land at High Point Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at High Point Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at High Point Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at High Point Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 April 2017.
Where is Land at High Point Farm?
12 km south-east of Loughton, Shropshire, United Kingdom (postcode DY14 9AD).