Planning pack for this site, £295Other options

Solar · United Kingdom

Stockton Court farm

Operator Renewable Power Exchange

Awaiting Construction5 MWData checked 16 November 2026Source record dated 17 September 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stockton Court farm is a 5 MW solar farm 9.7 km west of Stourport-on-Severn, Hereford and Worcester, United Kingdom. Its planning application (15/01017/FUL) went to Malvern Hills on 11 August 2015 and was granted on appeal on 5 April 2017. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 3 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stockton Court farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home13 kmSignificant
EIR-15512019Fire involving solar panels on a garage roof in Shropshire22 kmMinor
EIR-15472025Small fire within a solar panel at a house in Shropshire41 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Renewable Power Exchange
Location
Land Off, Stockton Road, Stockton-on-Teme, Worcester, Hereford and Worcester, WR6 6UT, United Kingdom
Planning authority
Malvern Hills
Planning application
15/01017/FUL
Appeal reference
APP/J1860/W/16/3149836

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01017/FUL, with what the planning evidence pack adds for this site.

Every application in Malvern Hills · Alerts for applications and incidents near here

  • 11 August 2015 Planning application submitted
  • 13 April 2016 Planning permission refused
  • 24 June 2016 Appeal lodged
  • 5 April 2017 Planning permission granted
  • 5 April 2017 Appeal granted
  • 1 May 2021 Planning permission expired

None found. The register holds no published incident that names Stockton Court farm. If you know of one, report it (confidential reports are anonymised).

Has Stockton Court farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stockton Court farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stockton Court farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 September 2019.
Where is Stockton Court farm?
9.7 km west of Stourport-on-Severn, Hereford and Worcester, United Kingdom (postcode WR6 6UT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).