Solar · United Kingdom
Land at Winshenford
Operator Elgar Middleton
Application Refused7 MWData checked 16 November 2026Source record dated 6 January 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land at Winshenford is a 7 MW solar farm 7.9 km north-west of Worcester, Hereford and Worcester, United Kingdom. Its planning application (15/01033/FUL) went to Malvern Hills on 31 July 2015 and was refused on 9 December 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 24 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land at Winshenford changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Elgar Middleton
- Location
- Land at Green Farm and Bush Farm, Monkwood Green, Hallow, Worcester, Hereford and Worcester, WR2 6NX, United Kingdom
- Planning authority
- Malvern Hills
- Planning application
- 15/01033/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/01033/FUL, with what the planning evidence pack adds for this site.
Every application in Malvern Hills · Alerts for applications and incidents near here
Timeline
- 31 July 2015 Planning application submitted
- 9 December 2015 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Land at Winshenford. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land at Winshenford had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land at Winshenford; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land at Winshenford?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 6 January 2016.
- Where is Land at Winshenford?
- 7.9 km north-west of Worcester, Hereford and Worcester, United Kingdom (postcode WR2 6NX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).