Solar · United Kingdom
Henwick Grove - Solar Panels
Operator University of Worcester
OperationalData checked 16 November 2026Source record dated 11 January 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Henwick Grove - Solar Panels is a solar farm on the edge of Worcester, United Kingdom. Its planning application (21/00828/GPJ) went to Worcester on 3 September 2021 and was granted on 7 January 2022. It has been operating since 28 November 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Henwick Grove - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Status
- Operational
- Operator or applicant
- University of Worcester
- Location
- University Of Worcester, Henwick Grove, Worcester, Worcestershire, WR2 6AJ, United Kingdom
- Planning authority
- Worcester
- Planning application
- 21/00828/GPJ
- First operating
- 2021
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/00828/GPJ, with what the planning evidence pack adds for this site.
Every application in Worcester · Alerts for applications and incidents near here
Timeline
- 3 September 2021 Planning application submitted
- 28 October 2021 Construction started
- 28 November 2021 Operational
- 7 January 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Henwick Grove - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Henwick Grove - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Henwick Grove - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Henwick Grove - Solar Panels?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
- Where is Henwick Grove - Solar Panels?
- On the edge of Worcester, United Kingdom (postcode WR2 6AJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).