Solar · United Kingdom
Stockton Court Farm
Operator Renewable Power Exchange
Application Withdrawn5 MWData checked 16 November 2026Source record dated 1 June 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Stockton Court Farm is a 5 MW solar farm 10 km south-west of Stourport-on-Severn, Hereford and Worcester, United Kingdom. Its planning application (16/00678/FUL) went to Malvern Hills on 21 April 2016 and was withdrawn on 25 May 2017. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 3 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Stockton Court Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Renewable Power Exchange
- Location
- Court Farm, Stockton Court, Stockton, Hereford and Worcester, WR6 6UT, United Kingdom
- Planning authority
- Malvern Hills
- Planning application
- 16/00678/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 16/00678/FUL, with what the planning evidence pack adds for this site.
Every application in Malvern Hills · Alerts for applications and incidents near here
Timeline
- 21 April 2016 Planning application submitted
- 25 May 2017 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Stockton Court Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Stockton Court Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Stockton Court Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Stockton Court Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2017.
- Where is Stockton Court Farm?
- 10 km south-west of Stourport-on-Severn, Hereford and Worcester, United Kingdom (postcode WR6 6UT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).