Battery storage · United Kingdom
The Waddings, Knighton-On-Teme - Battery Energy Storage System
Operator Integrum SPV 22298 Limited
Application Submitted60 MWData checked 16 November 2026Source record dated 20 January 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
The Waddings, Knighton-On-Teme - Battery Energy Storage System is a 60 MW battery storage site 12 km south of Loughton, Worcestershire, United Kingdom. Its planning application (M/24/01660/FUL) went to Malvern Hills on 4 December 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 8 other energy sites within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when The Waddings, Knighton-On-Teme - Battery Energy Storage System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Waddings, Knighton-On-Teme - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 80 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 80 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 121 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 130 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 60 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Integrum SPV 22298 Limited
- Location
- The Waddings, Knighton-On-Teme, Tenbury Wells, Worcestershire, WR15 8LY, United Kingdom
- Planning authority
- Malvern Hills
- Planning application
- M/24/01660/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for M/24/01660/FUL, with what the planning evidence pack adds for this site.
Every application in Malvern Hills · Alerts for applications and incidents near here
Timeline
- 4 December 2024 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names The Waddings, Knighton-On-Teme - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).
Questions
- Has The Waddings, Knighton-On-Teme - Battery Energy Storage System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names The Waddings, Knighton-On-Teme - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of The Waddings, Knighton-On-Teme - Battery Energy Storage System?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 20 January 2025.
- Where is The Waddings, Knighton-On-Teme - Battery Energy Storage System?
- 12 km south of Loughton, Worcestershire, United Kingdom (postcode WR15 8LY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).