← Back to Shropshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Whitton solar farm

Operator EBS Energy LLP

Revised8.6 MWData checked 16 November 2026Source record dated 4 April 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Whitton solar farm is a 8.6 MW solar farm 5.3 km east of Ludlow, Shropshire, United Kingdom. Its planning application (14/02873/FUL) went to Shropshire on 30 June 2014 and was refused on appeal on 22 March 2016. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 14 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EBS ENERGY LLP (OC383382), dissolved, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Whitton solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1551, Fire involving solar panels on a garage roof in Shropshire, 5.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15512019Fire involving solar panels on a garage roof in Shropshire5.5 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home29 kmSignificant
EIR-15472025Small fire within a solar panel at a house in Shropshire33 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
8.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
EBS Energy LLP
Location
Whitton Solar Farm Caynham, Shropshire, United Kingdom
Planning authority
Shropshire
Planning application
14/02873/FUL
Appeal reference
APP/L3245/W/15/3014413

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/02873/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 30 June 2014 Planning application submitted
  • 27 October 2014 Planning permission refused
  • 8 October 2015 Appeal lodged
  • 22 March 2016 Appeal refused

None found. The register holds no published incident that names Whitton solar farm. If you know of one, report it (confidential reports are anonymised).

Has Whitton solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Whitton solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Whitton solar farm?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2016.
Where is Whitton solar farm?
5.3 km east of Ludlow, Shropshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).