Planning pack for this site, £295Other options

Solar · United Kingdom

West Midlands Safari Park - Solar development

Operator West Midlands Safari Park

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 26 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

West Midlands Safari Park - Solar development is a 0.5 MW solar farm on the edge of Bewdley, Worcestershire, United Kingdom. Its planning application (23/0698/FUL) went to Wyre Forest on 25 September 2023 and was granted on 18 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for West Midlands Safari Park - Solar development sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home12 kmSignificant
EIR-15512019Fire involving solar panels on a garage roof in Shropshire29 kmMinor
EIR-12722022Fire in solar panel distribution board at Birmingham college32 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
West Midlands Safari Park
Location
West Midlands Safari Park Kidderminster Road Bewdley, Worcestershire, DY12 1LF, United Kingdom
Planning authority
Wyre Forest
Planning application
23/0698/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0698/FUL, with what the planning evidence pack adds for this site.

Every application in Wyre Forest · Alerts for applications and incidents near here

  • 25 September 2023 Planning application submitted
  • 18 July 2024 Planning permission granted
  • 18 July 2029 Planning permission runs out

None found. The register holds no published incident that names West Midlands Safari Park - Solar development. If you know of one, report it (confidential reports are anonymised).

Has West Midlands Safari Park - Solar development had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names West Midlands Safari Park - Solar development; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of West Midlands Safari Park - Solar development?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 July 2024.
Where is West Midlands Safari Park - Solar development?
On the edge of Bewdley, Worcestershire, United Kingdom (postcode DY12 1LF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).