Planning pack for this site, £295Other options

Solar · United Kingdom

Morrisons Superstore - Solar Photovoltaic

Operator WM Morrisons Supermarkets Plc

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 22 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Morrisons Superstore - Solar Photovoltaic is a 0.5 MW solar farm in Kidderminster, Worcestershire, United Kingdom. Its planning application (22/0151/PNO) went to Wyre Forest on 23 February 2022 and was granted on 29 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Morrisons Superstore - Solar Photovoltaic sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home12 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college29 kmMinor
EIR-15512019Fire involving solar panels on a garage roof in Shropshire32 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
WM Morrisons Supermarkets Plc
Location
Morrisons Superstore Green Street Kidderminster, Worcestershire, DY10 1AZ, United Kingdom
Planning authority
Wyre Forest
Planning application
22/0151/PNO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/0151/PNO, with what the planning evidence pack adds for this site.

Every application in Wyre Forest · Alerts for applications and incidents near here

  • 23 February 2022 Planning application submitted
  • 29 March 2022 Planning permission granted

None found. The register holds no published incident that names Morrisons Superstore - Solar Photovoltaic. If you know of one, report it (confidential reports are anonymised).

Has Morrisons Superstore - Solar Photovoltaic had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Morrisons Superstore - Solar Photovoltaic; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Morrisons Superstore - Solar Photovoltaic?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 March 2022.
Where is Morrisons Superstore - Solar Photovoltaic?
In Kidderminster, Worcestershire, United Kingdom (postcode DY10 1AZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).