Solar · United Kingdom

Hall Farm, East Beckham

Operator TGC Renewables

Operational10.2 MWData checked 16 November 2026Source record dated 30 April 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hall Farm, East Beckham is a 10.2 MW solar farm 3.4 km south-west of Sheringham, Norfolk, United Kingdom. Its planning application (PF/13/0772) went to North Norfolk on 27 June 2013 and was granted on 23 September 2013. It has been operating since 31 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 29 other sites and 146 energy sites within 40 km for Hall Farm, East Beckham

Members see the sites and incidents around this one, and every record behind them.

TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
10.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
TGC Renewables
Location
Hall Farm, Land At Hall Farm, East Beckham, Holt, Norfolk, BR11 8GA, Norfolk, United Kingdom
Planning authority
North Norfolk
Planning application
PF/13/0772
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PF/13/0772, with what the planning evidence pack adds for this site.

Every application in North Norfolk · Alerts for applications and incidents near here

  • 27 June 2013 Planning application submitted
  • 23 September 2013 Planning permission granted
  • 31 March 2014 Operational

None found. The register holds no published incident that names Hall Farm, East Beckham. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hall Farm, East Beckham had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hall Farm, East Beckham; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hall Farm, East Beckham?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 April 2014.
Where is Hall Farm, East Beckham?
3.4 km south-west of Sheringham, Norfolk, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).