Solar · United Kingdom

Redmoor Farm

Operator TGC Renewables

Planning Permission Expired25.5 MWData checked 16 November 2026Source record dated 3 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Redmoor Farm is a 25.5 MW solar farm 8.7 km north-east of Selby, North Yorkshire, United Kingdom. Its planning application (2015/0967/FUL) went to North Yorkshire on 21 August 2015 and was granted on 27 January 2017. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 27 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 29 other sites and 466 energy sites within 40 km for Redmoor Farm

Members see the sites and incidents around this one, and every record behind them.

TGC RENEWABLES LTD (07499954), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
25.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
TGC Renewables
Location
Redmoor Farm, Skipwith Common Road, North Duffield, Selby, North Yorkshire, YO8 5DE, United Kingdom
Planning authority
North Yorkshire
Planning application
2015/0967/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2015/0967/FUL, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 21 August 2015 Planning application submitted
  • 27 January 2017 Planning permission granted
  • 27 January 2020 Planning permission expired

None found. The register holds no published incident that names Redmoor Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Redmoor Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Redmoor Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Redmoor Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2020.
Where is Redmoor Farm?
8.7 km north-east of Selby, North Yorkshire, United Kingdom (postcode YO8 5DE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).