Solar · United Kingdom
Back Lane, Hempstead - Solar PV System
Operator Nethergate Farms
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 19 June 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Back Lane, Hempstead - Solar PV System is a 0.2 MW solar farm 7.8 km south-west of Sheringham, Norfolk, United Kingdom. Its planning application (PF/23/0196) went to North Norfolk on 13 February 2023 and was granted on 12 June 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Back Lane, Hempstead - Solar PV System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Back Lane, Hempstead - Solar PV System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2745, Fire at school solar panel convertor in Lowestoft, 62 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2745 | 2021 | Fire at school solar panel convertor in Lowestoft | 62 km | Minor |
| EIR-2522 | 2021 | Lowestoft school evacuated after electrical fire involving solar panels | 62 km | Minor |
| EIR-2815 | 2026 | Solar panel on school roof starts primary school fire in Ipswich | 92 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Nethergate Farms
- Location
- Back Lane, Hempstead, Norfolk, NR25 6TS, United Kingdom
- Planning authority
- North Norfolk
- Planning application
- PF/23/0196
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PF/23/0196, with what the planning evidence pack adds for this site.
Every application in North Norfolk · Alerts for applications and incidents near here
Timeline
- 13 February 2023 Planning application submitted
- 12 June 2023 Planning permission granted
- 12 June 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Back Lane, Hempstead - Solar PV System. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Back Lane, Hempstead - Solar PV System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Back Lane, Hempstead - Solar PV System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Back Lane, Hempstead - Solar PV System?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 June 2023.
- Where is Back Lane, Hempstead - Solar PV System?
- 7.8 km south-west of Sheringham, Norfolk, United Kingdom (postcode NR25 6TS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).