← Back to Wiltshire

Solar · United Kingdom

Land at East Farm

Operator Anesco · Owner Quanesco Midco Limited

Operational6.8 MWData checked 16 November 2026Source record dated 2 June 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at East Farm is a 6.8 MW solar farm 11 km east of Warminster, Wiltshire, United Kingdom. Its planning application (W/12/02216/FUL) went to Wiltshire on 3 January 2013 and was granted on 19 March 2013. It has been operating since 9 November 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 291 energy sites within 40 km for Land at East Farm

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Codford Dairy, East Farm, Church Lane, Codford, Wiltshire, United Kingdom
Planning authority
Wiltshire
Planning application
W/12/02216/FUL
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/12/02216/FUL, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 3 January 2013 Planning application submitted
  • 19 March 2013 Planning permission granted
  • 9 October 2013 Construction started
  • 9 November 2013 Operational

None found. The register holds no published incident that names Land at East Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at East Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at East Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at East Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 June 2014.
Where is Land at East Farm?
11 km east of Warminster, Wiltshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).