← Back to Wiltshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Codford Biogas - Battery Energy Storage System

Operator Codford Biogas Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 27 October 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Codford Biogas - Battery Energy Storage System is a battery storage site 12 km east of Warminster, Wiltshire, United Kingdom. Its planning application (PL/2023/07227) went to Wiltshire on 30 August 2023 and was granted on 25 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Codford Biogas - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 61 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire61 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter113 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction172 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Codford Biogas Limited
Location
Codford Biogas, Malmpit Hill, Codford, Warminster, Wiltshire, BA12 0FD, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2023/07227

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2023/07227, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 30 August 2023 Planning application submitted
  • 25 October 2023 Planning permission granted
  • 25 October 2026 Planning permission expired

None found. The register holds no published incident that names Codford Biogas - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Codford Biogas - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Codford Biogas - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Codford Biogas - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 October 2023.
Where is Codford Biogas - Battery Energy Storage System?
12 km east of Warminster, Wiltshire, United Kingdom (postcode BA12 0FD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).