← Back to Wiltshire

Solar · United Kingdom

East Codford Solar Farm Extension Phase 3

Operator Centrica Plc

Operational18 MWData checked 16 November 2026Source record dated 13 June 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

East Codford Solar Farm Extension Phase 3 is a 18 MW solar farm 12 km east of Warminster, Wiltshire, United Kingdom. Its planning application (19/03576/FUL) went to Wiltshire on 8 April 2019 and was granted on 18 December 2020. It has been operating since 1 September 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 287 energy sites within 40 km for East Codford Solar Farm Extension Phase 3

Members see the sites and incidents around this one, and every record behind them.

CENTRICA PLC (03033654), active, since 1995. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Centrica Plc
Location
Clay Pit Hill Codford Down Eas, Codford, Warminster, Wiltshire, BA12 0PJ, United Kingdom
Planning authority
Wiltshire
Planning application
19/03576/FUL
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/03576/FUL, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 8 April 2019 Planning application submitted
  • 18 December 2020 Planning permission granted
  • 25 April 2022 Construction started
  • 1 September 2022 Operational

None found. The register holds no published incident that names East Codford Solar Farm Extension Phase 3. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has East Codford Solar Farm Extension Phase 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names East Codford Solar Farm Extension Phase 3; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of East Codford Solar Farm Extension Phase 3?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 13 June 2023.
Where is East Codford Solar Farm Extension Phase 3?
12 km east of Warminster, Wiltshire, United Kingdom (postcode BA12 0PJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).