← Back to Wiltshire

Solar · United Kingdom

Land at East Farm - extension

Operator J.M. Stratton & Co.

Operational6 MWData checked 16 November 2026Source record dated 1 July 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at East Farm - extension is a 6 MW solar farm 12 km east of Warminster, Wiltshire, United Kingdom. Its planning application (13/05001/FUL) went to Wiltshire on 9 October 2013 and was granted on 7 January 2014. It has been operating since 1 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

286 energy sites within 40 km for Land at East Farm - extension

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
J.M. Stratton & Co.
Location
East Farm, Codford, Warminster, Wiltshire, BA12 0PJ, United Kingdom
Planning authority
Wiltshire
Planning application
13/05001/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/05001/FUL, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 9 October 2013 Planning application submitted
  • 7 January 2014 Planning permission granted
  • 1 March 2016 Operational
  • 1 May 2016 Construction started

None found. The register holds no published incident that names Land at East Farm - extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at East Farm - extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at East Farm - extension; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at East Farm - extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2016.
Where is Land at East Farm - extension?
12 km east of Warminster, Wiltshire, United Kingdom (postcode BA12 0PJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).