← Back to Derbyshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Newton Wood Farm

Operator Anesco · Owner Quanesco Midco Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 25 March 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Newton Wood Farm is a 49.9 MW battery storage site 4.3 km west of Sutton in Ashfield, Derbyshire, United Kingdom. Its planning application (20/00202/FUL) went to Bolsover on 27 May 2020 and was granted on 28 October 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 71 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

22 Oct20 Nov
WholesaleBalancing mechanismDynamic ModerationDynamic Containment

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 7 Nov: 460 MWh out and 588 MWh in, active 66% of half hours, peak 21 MW of 50. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £8,472 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newton Wood Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells14 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool110 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire164 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Newton Wood Farm, Newtonwood Lane, Newton, Alfreton, Derbyshire, Derbyshire, DE55 5SG, United Kingdom
Planning authority
Bolsover
Planning application
20/00202/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/00202/FUL, with what the planning evidence pack adds for this site.

Every application in Bolsover · Alerts for applications and incidents near here

  • 27 May 2020 Planning application submitted
  • 28 October 2020 Planning permission granted
  • 28 October 2023 Planning permission expired

None found. The register holds no published incident that names Newton Wood Farm. If you know of one, report it (confidential reports are anonymised).

Has Newton Wood Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Newton Wood Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Newton Wood Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 March 2025.
Where is Newton Wood Farm?
4.3 km west of Sutton in Ashfield, Derbyshire, United Kingdom (postcode DE55 5SG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).