Planning pack for this site, £295Other options

Solar · United Kingdom

Brookside Way, Huthwaite - Solar Photovoltaics

Operator Tack

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 17 June 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brookside Way, Huthwaite - Solar Photovoltaics is a 0.3 MW solar farm 3 km west of Sutton in Ashfield, Nottinghamshire, United Kingdom. Its planning application (X/2024/0011) went to Ashfield on 12 April 2024 and was granted on 9 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 68 other energy sites within 10 km, 48 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brookside Way, Huthwaite - Solar Photovoltaics sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 39 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby39 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster45 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge56 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Tack
Location
3-5 Brookside Way, Huthwaite, Sutton in Ashfield, Nottinghamshire, NG17 2NL, United Kingdom
Planning authority
Ashfield
Planning application
X/2024/0011

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for X/2024/0011, with what the planning evidence pack adds for this site.

Every application in Ashfield · Alerts for applications and incidents near here

  • 12 April 2024 Planning application submitted
  • 9 May 2024 Planning permission granted

None found. The register holds no published incident that names Brookside Way, Huthwaite - Solar Photovoltaics. If you know of one, report it (confidential reports are anonymised).

Has Brookside Way, Huthwaite - Solar Photovoltaics had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brookside Way, Huthwaite - Solar Photovoltaics; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Brookside Way, Huthwaite - Solar Photovoltaics?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 June 2024.
Where is Brookside Way, Huthwaite - Solar Photovoltaics?
3 km west of Sutton in Ashfield, Nottinghamshire, United Kingdom (postcode NG17 2NL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).