Battery storage · United Kingdom

Persley BESS - Battery Storage

Operator Anesco · Owner Quanesco Midco Limited

Awaiting Construction70.1 MWData checked 16 November 2026Source record dated 1 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Persley BESS - Battery Storage is a 70.1 MW battery storage site 5.2 km north-west of Aberdeen, United Kingdom. Its planning application (ECU00005113) went to Scottish Government (S36) on 16 April 2024 and was granted on 4 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Persley BESS - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 424 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool424 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells456 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire608 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
70.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
North of Persley Wastewater Treatment Plant, Aberdeenshire, AB22 8AT, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00005113

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00005113, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 16 April 2024 Planning application submitted
  • 4 June 2025 Planning permission granted
  • 4 June 2030 Planning permission runs out

None found. The register holds no published incident that names Persley BESS - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Persley BESS - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Persley BESS - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Persley BESS - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2025.
Where is Persley BESS - Battery Storage?
5.2 km north-west of Aberdeen, United Kingdom (postcode AB22 8AT).