Solar · United Kingdom
Lower Bodachra - Solar Panels
Operator Novus Renewables Services Limited
Awaiting Construction72 MWData checked 16 November 2026Source record dated 20 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Lower Bodachra - Solar Panels is a 72 MW solar farm 7.7 km north-west of Aberdeen, United Kingdom. Its planning application (ECU00004848) went to Scottish Government (S36) on 10 September 2024 and was granted on 24 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Lower Bodachra - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lower Bodachra - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 85 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 85 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 149 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 202 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 72 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Novus Renewables Services Limited
- Location
- Lower Bodachra, Whitestripes Road, Dyce, Aberdeenshire, AB21 7AP, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00004848
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00004848, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 10 September 2024 Planning application submitted
- 24 June 2025 Planning permission granted
- 24 June 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Lower Bodachra - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Lower Bodachra - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Lower Bodachra - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Lower Bodachra - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 February 2026.
- Where is Lower Bodachra - Solar Panels?
- 7.7 km north-west of Aberdeen, United Kingdom (postcode AB21 7AP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).