← Back to Offshore

Offshore wind · United Kingdom

Gunfleet Sands II

Operator Orsted (formerly Dong Energy)

Operational64.8 MWData checked 16 November 2026Source record dated 20 November 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gunfleet Sands II is a 64.8 MW offshore wind farm 9.3 km south-east of Clacton-on-Sea, United Kingdom. Its planning application went to DECC (S36) on 18 June 2007 and was granted on 28 February 2008. It has been operating since 24 July 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 13 other sites and 139 energy sites within 40 km for Gunfleet Sands II

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
Wholesale

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 11,519 MWh, running 92% of half hours, peak 32 MW of 65, load factor 26%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £58,367 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Offshore wind
Capacity
64.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Orsted (formerly Dong Energy)
Location
5 Miles from the Essex coast at Frinton-on-Sea, Offshore, United Kingdom
Planning authority
DECC (S36)
First operating
2009
Turbines
18

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in DECC (S36) · Alerts for applications and incidents near here

  • 18 June 2007 Planning application submitted
  • 28 February 2008 Planning permission granted
  • 1 April 2009 Construction started
  • 24 July 2009 Operational

None found. The register holds no published incident that names Gunfleet Sands II. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gunfleet Sands II had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gunfleet Sands II; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Gunfleet Sands II?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 November 2017.
Where is Gunfleet Sands II?
9.3 km south-east of Clacton-on-Sea, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).