Solar · United Kingdom
Jaywick Water Recycling Centre
Operator Anglian Water
Operational0.9 MWData checked 16 November 2026Source record dated 30 June 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Jaywick Water Recycling Centre is a 0.9 MW solar farm 3.5 km west of Clacton-on-Sea, Essex, United Kingdom. Its planning application (17/02045/CMTR) went to Tendring on 24 November 2017. It has been operating since 16 December 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Jaywick Water Recycling Centre changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Anglian Water
- Location
- Jaywick Water Recycling Centre, Clacton-on-Sea, Essex, CO15 2NY, United Kingdom
- Planning authority
- Tendring
- Planning application
- 17/02045/CMTR
- First operating
- 2019
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 17/02045/CMTR, with what the planning evidence pack adds for this site.
Every application in Tendring · Alerts for applications and incidents near here
Timeline
- 24 November 2017 Planning application submitted
- 16 November 2019 Construction started
- 16 December 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Jaywick Water Recycling Centre. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Jaywick Water Recycling Centre had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Jaywick Water Recycling Centre; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Jaywick Water Recycling Centre?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2020.
- Where is Jaywick Water Recycling Centre?
- 3.5 km west of Clacton-on-Sea, Essex, United Kingdom (postcode CO15 2NY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).