Chard Solar Park is a 3 MW solar farm on the edge of Chard, Somerset, United Kingdom. Its planning application (15/03187/FUL) went to Somerset on 15 July 2015 and was granted on 28 October 2015. It has been operating since 23 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 8 other sites and 296 energy sites within 40 km for Chard Solar Park

Members see the sites and incidents around this one, and every record behind them.

CONERGY UK LIMITED (07884713), dissolved, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Conergy
Owner
Kawa Solar Holdings LTD
Location
Land Os 5600, Chaffcombe Road, Chard, Somerset, Somerset, TA20 1RR, United Kingdom
Planning authority
Somerset
Planning application
15/03187/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/03187/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 15 July 2015 Planning application submitted
  • 28 October 2015 Planning permission granted
  • 7 December 2015 Construction started
  • 23 March 2016 Operational

None found. The register holds no published incident that names Chard Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chard Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chard Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chard Solar Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2016.
Where is Chard Solar Park?
On the edge of Chard, Somerset, United Kingdom (postcode TA20 1RR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).